Laserfiche WebLink
<br /> I (bfl q <br /> framework of the information specified in this RFP. <br /> The configuration should meet the System Performance Requirements <br /> in Sections 8.04 and 8.05 for a period of five (5) years. If in the <br /> event, the hardware configuration proposed does not meet these -. <br /> requirements during these fives years, then at the sole expense of the <br /> vendor, vendor will supply the City additional hardware to meet the <br /> performance requirements. Vendor will be responsible for all costs, <br /> shipping and installation fees associated with making the hardware <br /> configuration to meet the performance requirements. <br /> . <br /> RFP 94-00 I <br /> Page 36 <br />