Laserfiche WebLink
<br /> I (bA r <br /> the system. <br /> A. Execution of test. <br /> This test will not be performed until after three (3) full months of data entry <br /> of records into the automated system. After the initial execution of this test, <br /> the test may randomly be selected to be executed in order to ascertain whether <br /> the automated system (hardware and software) meets the minimum <br /> qualifications. The City will execute the examination again in one (I) year <br /> after the acceptance of the system. <br /> B. The City will prepare transaction logs to be used by the operators in <br /> perfonning the test. A mix of transactions pertaining to the operation <br /> of the Municipal Court will be used. The City has the final approval <br /> of the transactions used during the test. <br /> C. No test shall be deemed valid unless a minimum of ten (l0) timings <br /> were performed at the monitored workstation for each type of <br /> transaction. <br /> D. There will be three (3) staffing levels necessary to perform the test. <br /> These are: <br /> ~ <br /> 1. Operators - Each designated workstation will be operated by <br /> fully trained City employees. <br /> 2. Monitors - Selected workstations will have monitor personnel to <br /> measure and record response times. All measurements must be <br /> taken with a stopwatch. Use of standard watches or clocks will <br /> not be permitted. <br /> 3. Jurors - City personnel and vendor representatives will serve as <br /> system jurors. These individuals will be present to supervise <br /> the proper application of test procedures and to calculate the <br /> final results of the test. <br /> E. The monitors will use 'Response Time Test Measurement Worksheets' <br /> to document all measured transactions. It is the responsibility of the <br /> monitor to correctly note on the form, prior to the application of the <br /> test, the following information: <br /> 1. The terminal location being measured <br /> 2. The type of terminal at which the measurement was taken <br /> 3. The line speed, where applicable, to the terminal where the <br /> measurement is being taken <br /> 4. The processor to which the terminal is connected during the <br /> RFP 94-001 <br /> Page 39 <br />