My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1992-038
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1992
>
Res 1992-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2007 1:16:27 PM
Creation date
7/11/2007 1:16:27 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1992-38
Date
3/23/1992
Volume Book
106
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COJilSTRUCTIOJil COlftRAC'.r <br /> <br />THE STATE OF TEXAS <br />COUNTY OF HAYS <br /> <br />This Construction Contract performable in Hays County, <br /> <br />Texas, is entered into this day by and between the City of <br /> <br /> <br />San Marcos, a Texas municipal corporation hereinafter <br /> <br />referred to as "Owner", acting through its duly authorized <br /> <br />Ci ty Manager and the San llareos Telephone Co.pany, Ine. whose <br /> <br /> <br />address is 208 S. Guadalupe Street, San llareos, Texas 78666 <br /> <br />hereinafter referred to as "Contractor". <br /> <br />WI"ftmSSEm: <br />1. <br />Contractor agrees to provide the labor, machinery, and <br />steel casing necessary to complete four 12 inch diameter road <br />bores approximately 75 feet long and two 4 inch diameter road <br />bores approximately 75 feet long on Loop 82, San Marcos, <br />Texas in accordance with the attached plans and <br />specifications which are made a part of this contract. The <br />Contractor also agrees to complete the digging and clean up <br />of each bore pit. Contractor acknowledges that the actual <br />length of each bore may vary from these approximations, but <br />that the lump sum payment described in Paragraph 6 hereof <br />shall be a fixed and complete compensation for all of the <br />bores regardless of their actual length. <br />
The URL can be used to link to this page
Your browser does not support the video tag.