Laserfiche WebLink
<br /> contractors (e.g., legal notice requirements and the provision of City <br /> facilities for pre-bid conferences). <br /> 2.9 Direct the CONSULTANT to perform any Additional Services <br /> necessary to complete the Project or shall furnish such services <br /> itself. <br /> 2.10 Pay all fees for filing and processing permits in connection with <br /> the Project. <br /> 2.11 Bear all costs incident to this Article. <br /> 2.12 Provide its standard construction contract documents which do not <br /> include plans or technical specifications, to the CONSULTANT prior to <br /> commencement of the design development phase, Paragraph l.3. <br /> 2.13 Furnish all necessary field surveys and geotechnical <br /> investigations which are required to collect design data. Field <br /> surveys for construction purposes generally include the layout of <br /> structures, pipelines, roadways, quantity and measurement <br /> determinations, and surveys required to establish location of land <br /> boundaries and corners. The CONSULTANT shall establish the scope of <br /> these surveys as set forth in Article I, Subparagraph 1.2.5. <br /> 2.14 Provide building space suitable for use as an office on the <br /> resident inspector, the storage of records, drawings, files, samples, <br /> contractor submittals and other work related material until thirty (30) <br /> days following completion of the project. The space shall be air <br /> conditioned and shall be in proximity to the Project location. <br /> ARTICLE 3 <br /> COBSTRUCTIOR COST <br /> 3.1 DEFIBITIOR <br /> 3..1.1 The Construction Cost shall be the total cost or estimated cost <br /> to the CITY of all elements and phases of the Project designed or <br /> specified by the CONSULTANT. <br /> 3.1.2 The Construction Cost shall include at current market rates, <br /> including a reasonable allowance for overhead and profit, the cost of <br /> any equipment which has been designed, specified, selected or specially <br /> provided for by the CONSULTANT, except that used materials and <br /> equipment shall be included as if purchased new for the Project. <br /> -12- <br />