My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01171983 Special Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
1980 s
>
1983
>
01171983 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2006 10:07:52 AM
Creation date
12/2/2003 4:25:01 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Special Meeting
Date
1/17/1983
Volume Book
60
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> REPORT II <br /> SOLID WASTE COLLECTION AND DISPOSAL <br /> OPTIONS <br /> This report is a summation of the investigation conducted to determine <br /> alternatives available to the City for the collection and disposal of <br /> their solid waste. It includes an analysis of the current operations <br /> and costs of the City's system as well as four alternatives to the <br /> existing operations. The assumptions and facts used in the analysis <br /> of the alternatives are listed in detail in Attachment A. <br /> The City currently serves approximately 3800 residential customers and <br /> approximately 530 commercial accounts. The income generated from the <br /> existing clean up operation was $464,173.20 during fiscal year 1981- <br /> 1982. This revenue was produced by a residential rate of $4.00 per <br /> month per customer and an average charge of $34.59 per month per com- <br /> mercial account plus approximately $37,600 generated by landfill fees <br /> and $6,800 by brush pickup. Reported expenditures for this period were <br /> $397,374.96. Although a comparison of these figures indicates that the <br /> current operation produced an income of $66,798.24, the reported expen- <br /> ditures do not include any machinery, equipment or capital outlay ex- <br /> penses, or any associated clean up operational support costs, i.e., <br /> administration, accounting or insurance costs. <br /> Assuming a six year amortization at 12% of all machinery and equipment <br /> utilized in the system and an associated support cost of 10% of the <br /> total reported expenditures, the Actual Cost of Service is more accurate- <br /> ly estimated to be $682,741. <br /> THIS IS A DEFICIT OF $218,568. <br /> PAGE -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.