My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1992-140
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1992
>
Res 1992-140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2007 2:34:48 PM
Creation date
7/12/2007 2:34:48 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1992-140
Date
11/23/1992
Volume Book
108
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> } 3Kf3 <br /> applicable standards and, upon request, submit to CITY, documentation <br /> of such calibration. <br /> 2.5 PROJECT REPORTS SwL agrees to submit written reports required <br /> under this agreement to the CITY no later than three days from the date <br /> tests and/or inspections are completed indicating, where applicable, <br /> compliance with project specifications. SwL will consider all reports <br /> to be the property of CITY and will distribute reports only to those <br /> persons, organizations or agencies specifically designated in writing <br /> by the CITY. SwL further agrees to retain all pertinent records <br /> relating to the services performed by SwL under this agreement for a <br /> period of five years following the submission of pertinent reports, <br /> during which period the records will be available to CITY for review at <br /> mutually acceptable times. <br /> 2.6 DAMAGE TO EXISTING :HAN -HADE OBJECTS CITY agr-ees to hold SwL <br /> harmless from all claims, costs and expenses occurring or with respect <br /> to SwL's performance of its work and arising from subsurface or latent <br /> conditions or damage to subsurface or latent objects, structures, lines <br /> or conduits where the actual or potential presence and location thereof <br /> vas not revealed to SwL by CITY. <br /> , <br /> 2.7 RESPONSIBILITY SwL, by its performance of services covered <br /> hereunder, does not in any way assume, abridge or abrogate any of those <br /> duties, responsibilities or authorities with regard to the Project <br /> which, by custom or contract are vested in the project architects, <br /> design engineers, or any other design agencies or authorities. SwL is <br /> not authorized to supervise, alter, relax, enlarge or release any <br /> requirement of the project specifications or other contract documents <br /> nor to approve or accept any portion of the work, unless specifically <br /> authorized in writing by CITY or its authorized representative. SwL <br /> shall not have the right of rejection or the right to stop the work, <br />
The URL can be used to link to this page
Your browser does not support the video tag.