Laserfiche WebLink
<br /> GL <br /> SAN MARCOS ELECTRIC UTILITY <br /> ELECTRIC TARIFF <br />ISSUED BY: CITY OF SAN MARCOS, TEXAS SHEET NO. - <br />EFFECTIVE DATE: 3/1/92 REVISION NO. - <br /> <br />MEDIUM GENERAL SERVICE - TIME-OF-DAY RATE <br /> RATE SCHEDULE - MGS-TD <br />The City shall charge and collect for medium general service, <br />time-of-day rate, on the basis of the provisions of this Rate <br />Schedule - MGS-TD. The Power Cost Adjustment Clause and Rules and <br />Regulations for Electric Service are incorporated by reference as <br />a part of this rate schedule. <br />AVAILABILITY <br />This rate schedule is available throughout the entire <br />territory served by the City of San Marcos. <br />APPLICABILITY <br /> ~ <br />This rate schedule is applicable to all time-of-day service <br />required for lighting, power and any other purpose, other than <br />residential service as defined in Rate Schedule - RS, where the <br />maximum metered demand is 50 kW or greater but less than 500 kW <br />and for which no specific rate schedule is available. If the <br />maximum metered demand is 500 kW or greater for any two months <br />during any twelve month period, the City will transfer the <br />customer to the then applicable general service rate schedule. <br />This rate schedule is only applicable to qualified customers <br />who require a substantial portion ot their electrical demand <br />during the Off-Peak period, as defined herein. Prior to a <br />customer receiving service, the city will investigate the load <br />characteristics of such customer in order to determine if this <br />rate schedule may be advantageous for the customer. If the city <br />determines that the customer is qualified to receive service under <br />this rate schedule, special metering equipment will be installed <br />to measure the customer's demand and energy requirements during <br />the On-Peak and Off-Peak periods. <br /> 10 <br />