Laserfiche WebLink
<br /> ~5 <br />SAN MARCOS ELECTRIC UTILITY <br />ELECTRIC TARIFF <br />ISSUED BY: CITY OF SAN MARCOS, TEXAS SHEET NO. - <br />EFFECTIVE DATE: 3/1/92 REVISION NO. - <br /> <br />LARGE GENERAL SERVICE <br />RATE SCHEDULE - LGS <br />POWER FACTOR ADJUSTMENT <br />The monthly metered demand will be adjusted to an equivalent <br />90% power factor for billing purposes when the power factor at any <br />point of delivery is determined to be less than 90%. Such <br />adjustment will be deferred for six months at a new point of <br />delivery to allow for corrective action by the customer. <br />INTERRUPTION OF SERVICE <br />The city will make reasonable provisions to insure <br />satisfactory and continuous service, but does not guarantee.a <br />continuous supply of electrical power and energy and shall not be <br />liable for damage occasioned by interruptions of service or <br />failure to commence delivery caused by acts of God, or the public <br />enemy, or for any cause reasonably beyond its control, including, <br />but not limited to the failure or breakdown of facilities, floods, <br />fire, strikes, or actions or orders of any agency having <br />jurisdiction in the premises, or for interruptions which are <br />necessary for inspection, repair, or changes in equipment or <br />facilities of the City or its bulk power suppliers. <br />The Customer shall notify the city immediately of any, <br />defects, trouble or accident which may in any way affect the <br />delivery of electric service by the city. <br /> 17 <br />