My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1992-088
San-Marcos
>
City Clerk
>
02 Ordinances
>
1990 s
>
1992
>
Ord 1992-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2007 2:39:43 PM
Creation date
7/12/2007 2:39:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
1992-88
Date
12/7/1992
Volume Book
109
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> &BJ <br /> .. <br /> CITY OF SAN MARCOS <br /> DISTRIBUTION LINE EXTENSION POLICY <br /> APPENDIX B <br /> COMMERCIAL SERVICE <br /> The City will construct an overhead primary line extension to <br /> provide permanent service to a co11l!!tercial facility requiring full <br /> time service at the regular established rates and minimum monthly <br /> charges under the following conditions: <br /> 1. GENERAL SERVICE AND SMALL CåMMERCIAL <br /> a. A standard overhead line extension of up to 1200 feet <br /> for single phase service or 400 feet for three phase <br /> service, will be provided for General Service and Small <br /> Commercial customers requiring full time service to <br /> shops, stores, offices and other similar facilities. <br /> Non-standard installations and extensions in excess of <br /> the above stated footage will only be made if the <br /> customer pays the additional cost incid~nt thereto. <br /> b. Electric service will be provided to water wells, barns, <br /> signs and other non-residential locations from the <br /> City's existing primary lines. In situations where the <br /> extension of primary facilities is required, the <br /> applicant will be required to pay the estimated cost in <br /> advance for constructing the extension. <br /> 2. LARGE COMMERCIAL - The City will extend standard overhead <br /> lines to provide service to a Large Commercial customer <br /> requiring full time electric' service up to 1200 feet for <br /> single phase service or for 400 feet for three phase service. <br /> The customer may be requi'red to pay the cost for those <br /> situations where the line extension exceeds the length <br /> allowed. However, each new Large Commercial facility will be <br /> evaluated to determine if the anticipated annual revenues <br /> will provide the necessary margins to permit a longer <br /> extension. <br /> 3. EXCESS CONSTRUCTION COST DETERMINATION - In the situation <br /> where a line extension for electric service exceeds the <br /> maximum length provided as a standard by the city, the <br /> customer will be required to pay the City, in advance of any <br /> construction of the extension, an amount to be determined as <br /> follows: <br />! <br />I <br />! <br />, <br /> -60- <br />
The URL can be used to link to this page
Your browser does not support the video tag.