Laserfiche WebLink
<br /> ~8K <br /> -, <br /> CITY OF SAN MARCOS <br /> LINE DISTRIBUTION EXTENSION POLICY <br /> APPENDIX B (continued) <br /> The required length of the extension shall be <br /> established by a field survey performed by the <br /> city. The total length of the extension will <br /> be reduced by the maximum allowed for the type <br /> of service to obtain the excess construction <br /> required state in feet. The number of feet of <br /> excess,construc;tion wi;Ll then be multiplied by <br /> the City's Standard Construction Costs for the <br /> type of extension required to obtain. the <br /> amount of the required payment. <br />Where it can be demonstrated that the expected annual <br />revenues (derived from base rates, exclusive of fuel) to be <br />paid by the prospective customer will generate the required <br />margins to cover the total cost of constructing the <br />extension, disregarding any allowance, the ~i ty may, at its <br />option, extend service. without an excess construction cost <br />payment by the customer. <br /> , <br /> -61- <br />