My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1991-055
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1991
>
Res 1991-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2007 4:49:03 PM
Creation date
7/13/2007 4:49:02 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1991-55
Date
4/29/1991
Volume Book
102
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Owner, the Engineer will have authority to require special <br /> inspection or testing of the Work in accordance with the <br /> provisions of the construction contract documents, whether or not <br /> the Work is then fabricated, installed or completed. The Engineer <br /> shall monitor and review the work and results of all testing <br /> laboratories as required by the Owner. <br /> 1. 3 . 10 The Engineer shall review and make all decisions <br /> regarding the approval or taking of other appropriate action upon <br /> the Contractor's submittals, including but not limited to, Shop <br /> Drawings, Product Data and Samples, Schedule of Values and <br /> progress schedule. Such action shall be taken with reasonable <br /> promptness, but generally not to exceed fifteen (l5) days or such <br /> period of time which will not cause delay of the Project. <br /> 1.3.11 The Engineer shall prepare Change Orders for the Owner's <br /> approval and execution in accordance with the construction <br /> contract documents, but shall not issue change orders not <br /> previously approved in writing by the Owner, and no course of <br /> conduct on the part of the Engineer or the Owner shall act to <br /> amend, waive or alter this prov1sion. If additive Change Orders <br /> are required as a result of any error(s) and/or omission(s) of the <br /> Engineer as determined by the Owner, the Engineer shall, within <br /> thirty (30) days of receipt of an invoice therefor from the Owner, <br /> reimburse the Owner in an amount equal to ten percent (10%) of the <br /> amount of the additive change order. <br /> 1. 3 . 12 The Engineer shall conduct professional inspections to <br /> determine the Dates of Substantial Completion and final <br /> -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.