My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-089/Approving an agreement between Alan Plummer Associates for professional engineering services in connection with a Water Master Plan Update
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-089/Approving an agreement between Alan Plummer Associates for professional engineering services in connection with a Water Master Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 9:59:40 AM
Creation date
6/27/2013 3:49:38 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-89
Date
6/18/2013
Volume Book
198
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Additional field verification services, Including mobile technology verification requiring more <br />than 24 hours of field work or analysis. <br />• Master meter installations. <br />• Pump performance testing beyond the pumps listed in Task D. <br />• Additional copies of project deliverables. <br />• Additional training or ongoing technical support, Including training City staff on the use of <br />mobile technology for field verification of assets. <br />• Technical support In the development of projected water and wastewater rates. <br />• Technical support in the development of bond funding packages. <br />• Technical support with contract negotiations with neighboring utilities concerning connections <br />to the system. <br />• Water quality modeling for specific quality parameters, other than water age. <br />• Capacity analysis related to developments including, but not limited to, Whisper Texas, McCarty <br />Commons, Gas Lamp PID. These analyses will be evaluated as part of the Miscellaneous Water <br />Modeling Contract between APAI and the City of San Marcos. <br />• Any other activities not specifically identified in BASIC SERVICES. <br />If the ENGINEER Identifies an Additional Service that Is required, the ENGINEER shall provide notice to <br />the DISTRICT and provide a budget estimate for the specific scope. The ENGINEER shall not proceed with <br />the Additional Services without specific written authorization from the DISTRICT. <br />PROJECT SCHEDULE <br />The ENGINEER shall deliver the Draft Water Master Plan Update within ten (10) months of receiving all <br />information listed in Task A of this Scope of Services. The Final Water Master Plan Update will be <br />delivered within two (2) weeks of receiving final comments from the CLIENT on the draft report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.