Laserfiche WebLink
Union Pacific Railroad Company <br />PUBLIC HIGHWAY AT -GRADE CROSSING IMPROVEMENT AGREEMENT <br />Fukm Aonroved: AVRLaw <br />BUILDING AMER" <br />Exhibit A -1 Detailed Prints <br />Exhibit B Railroad's Signal Material and Force Account Estimate <br />Exhibit B -1 Railroad's Annual Signal Maintenance Estimate <br />Exhibit C Railroad's Form of Contractor's Right of Entry Agreement <br />Exhibit D General Terms and Conditions <br />SECTION 2. <br />The Railroad, at City's expense, shall furnish all labor, material, equipment and supervision <br />for the Roadway improvements: <br />• Install new exit gates & EGMS system in a new cabin with new remote, <br />• Engineering, and <br />• Flagging. <br />SECTION 3. <br />A. The work to be performed by the Railroad, at the City's sole cost and expense, is described in <br />the Railroad's Signal Material and Force Account Estimate dated November 5, 2012, in the <br />amount of, and not to exceed, $616,730.00, marked Exhibit B, attached hereto and hereby <br />made a part hereof (the "Estimate "). The City will be billed by the Railroad for the actual <br />Railroad costs incurred. <br />B. The Railroad, if it so elects, may recalculate and update the Estimate submitted to the City in <br />the event the City does not commence construction on the portion of the Project located on <br />the Railroad's property within six (6) months from the date of the Estimate. <br />C. The City acknowledges that the Estimate does not include any estimate of flagging or other <br />protective service costs that are to be paid by the City or the Contractor in connection with <br />flagging or other protective services provided by the Railroad in connection with the Project. <br />All of such costs incurred by the Railroad are to be paid by the City or the Contractor as <br />determined by the Railroad and the City. If it is determined that the Railroad will be billing <br />the Contractor directly for such costs, the City agrees that it will pay the Railroad for any <br />flagging costs that have not been paid by any Contractor within thirty (30) days of the <br />Contractor's receipt of billing. <br />D. The City agrees to reimburse the Railroad for one hundred percent (100 %) of all actual costs <br />incurred by the Railroad in connection with the Project including, but not limited to, actual <br />costs of preliminary engineering review, construction inspection, procurement of materials, <br />equipment rental, manpower and deliveries to the job site and all of the Railroad's normal <br />and customary additives (which shall include direct and indirect overhead costs) associated <br />therewith. <br />SECTION 4. <br />A. The City, at its expense, shall prepare, or cause to be prepared by others, the detailed plans <br />and specifications and submit such plans and specifications to the Railroad's Assistant Vice <br />President Engineering — Design, or his authorized representative, for review and approval. <br />The plans and specifications shall include all Roadway layout specifications, cross sections <br />and elevations, associated drainage, and other appurtenances. <br />2786 -25 City of San Marcos, TX Page 2 of 5 revised April 17, 2013 <br />Patton Street <br />