My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1991-047
San-Marcos
>
City Clerk
>
02 Ordinances
>
1990 s
>
1991
>
Ord 1991-047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2007 12:18:17 PM
Creation date
7/19/2007 12:18:16 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
1991-47
Date
8/26/1991
Volume Book
104
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> CITY OF SAN MARCOS ELECTRIC UTILITY <br /> ELECTRIC TARIFF <br /> MEDIUM GENERAL SERVICE - TIME-OF-DAY RATE <br /> RATE SCHEDULE - MGS-TD <br /> The City shall charge and collect for medium general service, <br />time-of-day rate, on the basis of the provisions of this Rate <br />Schedule - MGS-TD. The Power Cost Adjustment Clause and Rules and <br />Regulations for Electric Service are incorporated by reference as <br />a part of this rate schedule. <br />AVAILABILITY <br /> This rate schedule is available throughout the entire <br />territory served by the City of San Marcos. <br />APPLICABILITY <br /> This rate schedule is applicable to all time-of-day service <br />required for lighting, power and any other purpose, other than <br />residential service as defined in Rate Schedule - RS, where the <br />maximum metered demand is 50 kW or greater but less than 500 kW <br />and for which no specific rate schedule is available. If the <br />maximum metered demand is 500 kW or greater for any two months <br />during any twelve month period, the City will transfer the <br />customer to the then applicable general service rate schedule. <br /> This rate schedule is only applicable to qualified customers <br />who require a substantial portion of their electrical demand <br />during the Off-Peak period, as defined herein. Prior to a <br />customer receiving service, the City will investigate the load <br />characteristics of such customer in order to determine if this <br />rate schedule may be advantageous for the customer. If the City <br />determines that the customer is qualified to receive service under <br />this rate schedule, special metering equipment will be installed <br />to measure the customer's demand and energy requirements during <br />the On-Peak and Off-Peak periods. <br /> Customers requesting service under this rate schedule will be <br />required to execute a contract for service with a minimum term of <br />twelve (12) months. <br />CHARACTER OF SERVICE <br /> Service under this rate schedule shall be alternating <br />current, 60 Hertz, single or three phase, at the City's option of <br />standard available voltages. Standby or resale service is not <br />permitted under this rate schedule. <br /> - 8 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.