Laserfiche WebLink
<br /> S I T E D EVE LOP MEN T <br /> SAMPLING PORTS <br /> Prior to construction of an industrial facility whose <br /> operations will be subject to regulation under the Ordinance, the <br /> Director shall be contacted concerning sampling access needs for <br /> monitoring of liquid waste streams. Sampling sites will be <br /> unique to each facility dependent upon number of process units, <br /> pretreatment required, e t c., but all entities shall have a <br /> terminal sampling port in the lateral line at a point where the <br /> lateral intersects the City's wastewater collection system, <br /> unless the Director agrees to an alternative arrangement for <br /> sampling and process waste flow measurement. The City may, at <br /> the discretion of the Director, install the terminal access <br /> sampling port, or require the user to provide such a port at its <br /> own expense. <br /> FACILITY LAYOUT <br /> Sketches showing locations and types of process units; <br /> pretreatment units; sanitary facilities; storage sites for unused <br /> chemicals, spent chemicals and other waste residues awaiting <br /> off-site disposition; and locations of proposed floor <br /> sumps-drains in facility shall be provided to the Director. <br /> Sketches should be accompanied by brief written descriptions of <br /> each process or pretreatment unit function; size of each unit and <br /> liquid operating volume; chemicals utilized; anticipateq amount <br /> of liquid waste that will be generated and released to sewer in a <br /> given period; and methods of pretreatment that may be <br /> appropriate. <br /> 2 <br />