Laserfiche WebLink
■EN HALFF Pages <br />• Plan sheets (no profiles, a typical detail will be required for utility <br />crossings) <br />• Erosion /Sedimentation control sheets <br />• Traffic Control details <br />• Construction sequencing /phasing <br />• Details <br />2.4.2 Deliverables <br />• 2 full size sets, 2 half size sets, 1 PDF <br />• Project specific /special specifications <br />• Opinion of Probable Construction Cost <br />• Construction schedule <br />2.5 100% Design Plans <br />2.5.1 Halff will prepare the 100% design plans for the water line improvements <br />including the following: <br />• Cover sheet <br />• Project layout <br />• General notes <br />• Quantities broken down by page <br />• Plan sheets (no profiles, a typical detail will be required for utility <br />crossings) <br />• Erosion /Sedimentation control sheets <br />• Traffic Control details <br />• Construction sequencing/phasing <br />• Details <br />2.5.2 Deliverables <br />• 2 half size sets, 1 PDF, 1 CADD <br />• Project specific /special specifications <br />• Opinion of Probable Construction Cost <br />• Construction schedule <br />Task 3: Bid Phase Services <br />3.1 Bid Phase: <br />3.1.1 Attend Pre -bid meeting <br />3.1.2 Answer contractor questions <br />3.1.3 Bid tabulation and recommendation of award <br />3.2 Deliverables: <br />3.2.1 Bid Form (Word version) <br />