My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-101/Agreement Halff Associates, Inc. for professional engineering services w/the Airport 12-inch Water Main Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-101/Agreement Halff Associates, Inc. for professional engineering services w/the Airport 12-inch Water Main Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 10:03:56 AM
Creation date
7/17/2013 9:19:53 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2013-101
Date
7/2/2013
Volume Book
198
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■EN HALFF Pages <br />• Plan sheets (no profiles, a typical detail will be required for utility <br />crossings) <br />• Erosion /Sedimentation control sheets <br />• Traffic Control details <br />• Construction sequencing /phasing <br />• Details <br />2.4.2 Deliverables <br />• 2 full size sets, 2 half size sets, 1 PDF <br />• Project specific /special specifications <br />• Opinion of Probable Construction Cost <br />• Construction schedule <br />2.5 100% Design Plans <br />2.5.1 Halff will prepare the 100% design plans for the water line improvements <br />including the following: <br />• Cover sheet <br />• Project layout <br />• General notes <br />• Quantities broken down by page <br />• Plan sheets (no profiles, a typical detail will be required for utility <br />crossings) <br />• Erosion /Sedimentation control sheets <br />• Traffic Control details <br />• Construction sequencing/phasing <br />• Details <br />2.5.2 Deliverables <br />• 2 half size sets, 1 PDF, 1 CADD <br />• Project specific /special specifications <br />• Opinion of Probable Construction Cost <br />• Construction schedule <br />Task 3: Bid Phase Services <br />3.1 Bid Phase: <br />3.1.1 Attend Pre -bid meeting <br />3.1.2 Answer contractor questions <br />3.1.3 Bid tabulation and recommendation of award <br />3.2 Deliverables: <br />3.2.1 Bid Form (Word version) <br />
The URL can be used to link to this page
Your browser does not support the video tag.