My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-101/Agreement Halff Associates, Inc. for professional engineering services w/the Airport 12-inch Water Main Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-101/Agreement Halff Associates, Inc. for professional engineering services w/the Airport 12-inch Water Main Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 10:03:56 AM
Creation date
7/17/2013 9:19:53 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2013-101
Date
7/2/2013
Volume Book
198
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
[Delivery by Email: TJackson@Halff.com j <br />Proposal No: PAA13- 067 -00 <br />May 20, 2013, Revision No. 1 <br />Todd Jackson, P.E. <br />Halff Associates, Inc. <br />Two Sierra Way, Suite 105 <br />Georgetown, Texas 78626 <br />RE: Geotechnical Engineering Data Report <br />San Marcos Airport - Water Line Project <br />San Marcos, Texas <br />R A B A <br />ST <br />CONSULTANTS <br />Raba Kistner <br />Consultants, Inc. <br />8100 Cameron Road, Suite 8- -150 <br />Austin, TX 78754 <br />www.rkci.cosm <br />P 512 :; 339 ;; 1745 <br />F 512 :: 339 ;: 6174 <br />'€ r3FE Firm F -3257 <br />In accordance with your request, RABA KISTNER Consultants Inc. (RKCI) is pleased to submit this proposal <br />for Geotechnical Engineering Services to Halff Associates, Inc. for the referenced project. The broad <br />objectives of our study will be to determine soil conditions at the site and provide results of laboratory soil <br />analyses presented in a geotechnical data report. Described in this letter are: <br />• our understanding of pertinent project characteristics; <br />• our proposed scope for field and laboratory study; <br />• our proposed scope for engineering evaluation and reporting; <br />• our tentative project schedule; and <br />• our lump sum study cost. <br />Project Description <br />The project will consist of a new 12 -inch gravity water line at the San Marcos Airport. <br />Field <br />Based on conversations with the client in determining the geotechnical needs of the project, we have been <br />asked to drill up to four (4) borings extending to 5 ft below the existing ground surface. <br />Samples will be taken using conventional split- spoon /Shelby -tube sampling techniques. Borings will be <br />located in the field utilizing a recreation grade hand -held GPS device and /or tape and right angle <br />measurements from existing benchmarks. Our scope of service does not include surveying in the boring <br />locations. <br />The borings will be backfilled utilizing auger cuttings generated during drilling activities. If borings are <br />conducted through asphalt or concrete pavements, the surface of the bore holes will be patched with <br />either concrete or cold -patch asphalt. <br />San Antonio • Austin . Brownsville - Corpus Christi . Gallas • Cl Paso • Houston a McAllen , Mexico • Salt Lake City <br />
The URL can be used to link to this page
Your browser does not support the video tag.