Proposal No: PAA13- 067 -00 <br />May 20, 2013, Revision No. 1 <br />Laboratory Studv <br />2 <br />Upon completion of the subsurface exploration, a testing program will be designed to define the strength <br />and classification characteristics of the subsurface soils. The testing program may include moisture content <br />tests, Atterberg Limits (plasticity tests), unconfined compression (of the soil samples), corrosivity testing, <br />and grain size analyses; however, the type and number of tests will be based on subsurface conditions <br />encountered in the field. <br />Engineering Data Report <br />The results of the field and laboratory phases of the study will be reviewed by our staff of engineers and <br />geologists. The results of our review, together with the supporting field and laboratory data, will be <br />presented in a written, engineering data report. The Geotechnical Engineering Data Report will include the <br />following information, if applicable: <br />• A summary of the field and laboratory sampling and testing program, <br />• Boring logs and laboratory testing results; <br />• A review of general site conditions including descriptions of the site, the subsurface <br />stratigraphy, groundwater conditions, and the presence and condition of fill materials, if <br />encountered; and <br />• Report of existing pavement thickness and pavement type at each of the boring locations: <br />The final data report will be reproduced in 1 spirally -bound copies and a digital PDF file will also be <br />provided. <br />Tentative Project Schedule <br />Based on our present workload, we anticipate that we could begin the field exploration phase of this study <br />within 3 to 5 working days of receiving your written authorization, provided the site is accessible to our <br />truck - mounted drill rigs. The field exploration and laboratory testing phase of the study is expected to <br />take approximately 3 to 5 working days to complete. Preparation of the engineering data report is <br />expected to take an additional two to three weeks to complete. <br />Project Cost <br />The lump sum cost for the study scope outlined herein will be performed for a minimum fee of $3,050 <br />(includes mobilization, field work, laboratory testing, and data report for one (1) soil boring). Each <br />additional boring will be performed for a unit fee of $350 /each. The fees <br />This estimate does not include costs incurred to: <br />• Provide access to the boring locations which may be inaccessible to our drill rig <br />and support vehicle. We have prepared our proposal with the understanding that <br />RABAT I S T EP <br />