Laserfiche WebLink
N. LBJ Lift Station <br />Attachment A <br />Detailed Scope of Engineering Services <br />Below is a detailed list of the tasks by phase to be performed by the LAN team under this work <br />authorization based upon our meetings and the City's "Engineering Scope of Services Checklist ": <br />Basic Services <br />Preliminary Design Phase — LAN will provide a technical memorandum for the City summarizing <br />the anticipated growth in the sewershed that leads to the lift station, as well as the hydraulics of the <br />station. The memo will include a calculation of the system head for both the existing force main and <br />the anticipated future force main, to help in sizing the submersible pumps. The scope includes: <br />• Review of existing Reports /Studies/Drawings (includes memos from K Friese & Associates) <br />• Two (2) site visits <br />• Preparation of technical memorandum to summarize growth and hydraulics, including <br />recommended pump sizing <br />• Quality Control of technical memorandum <br />• Internal management during design phase <br />Design Phase: The design phase is anticipated to include submissions only at the 90% and Final time <br />periods. Based on recent discussions with the City, LAN will address the City's comments that were <br />provided, and will provide the detailed engineering necessary to allow the project to be bid. The <br />scope assumes that the current generator will remain in place an item has been added to the Special <br />Services category should the City determine that a larger generator is more advantageous. The <br />scope includes: <br />• Two project meetings with City staff. <br />• Electrical, instrumentation and control (I &C) design to include: <br />• Review of current applicable national, state and local codes and standards for project <br />compliance. <br />• Coordination with the Civil, Mechanical/Process, and Structural discipline leads as it <br />relates the Electrical and I &C components identified herein. <br />• Coordinate I &C requirements with the updated valve vault. <br />• Research and prepare grounding solutions for highly resistive rocky soils. <br />• Coordinate with the City's systems integrator and develop a new control schematic per <br />the Cottonwood LS go -by. <br />• Re -route lift station circuits per City of San Marcos direction. <br />• Preparation of electrical construction drawings (AutoCAD format) in one IFB /IFC <br />package. The construction drawings will include plans, sections, and details associated <br />with the electrical and I &C elements described herein along with general notes. <br />• Preparation of "Final Draft" construction drawings and specifications for review and <br />approval by the City of San Marcos followed by incorporation of comments and release <br />of the construction drawings and specifications for bid and construction. <br />• Structural design to include: <br />o Review of applicable national, state and local codes and standards for project <br />compliance. <br />Attachment A <br />Pagel of 4 <br />l'W, <br />