Laserfiche WebLink
N. LBJ Lift Station <br />• Complete revision of the Valve Vault. <br />• Minor modifications to the Lift Station associated with openings in the cover slab to <br />accommodate alternative pump equipment. <br />• Preparation of calculations for the revised Valve Vault. <br />• Coordination with the Civil, Mechanical/Process, and ElectricalI&C discipline leads as <br />relates the structural components identified above. <br />• Preparation of structural construction drawings (AutoCAD format) in one IFB/IFC <br />package. The construction drawings will include plans, sections, and details associated <br />with the structural elements described herein along with general notes. <br />• Preparation of "Final Draft" construction drawings and specifications for review and <br />approval by the City of San Marcos followed by incorporation of comments and release <br />of the construction drawings and specifications for bid and construction. <br />• Mechanical design to include: <br />• Review of applicable national, state and local codes and standards for project <br />compliance. <br />• Selection of submersible pumps for the project — preference is for Flygt "N" impellar. <br />• Complete revision of the Valve Vault. <br />o Minor modifications to the Lift Station to accommodate access. <br />• Coordination with the Civil, Structural, and ElectricaUI &C discipline leads as relates the <br />structural components identified above. <br />• Preparation of structural construction drawings (AutoCAD format) in one IFB/IFC <br />package. The construction drawings will include plans, sections, and details associated <br />with the structural elements described herein along with general notes. <br />• Preparation of "Final Draft" construction drawings and specifications for review and <br />approval by the City of San Marcos followed by incorporation of comments and release <br />of the construction drawings and specifications for bid and construction. <br />• Erosion and sedimentation control design plans. <br />• Traffic control (details included in set — not a detailed design plan). <br />• Construction sequencing provided in plans. <br />• Preparation of technical specifications and project manual. Documents will be prepared <br />based on the Standard City of San Marcos documents, when appropriate. Specifications will <br />be provided for review at both the 90% and Final design stages. <br />• Opinion of Probable Construction Cost will be provided at 90% and Final Design. <br />• Prepare anticipated construction schedule. <br />• Internal quality control reviews of 90% and Final submission sets. <br />• Prepare, print and submit 90% design plans to include 2 full size sets, 2 half size sets and I <br />PDF copy. Prepare, print and submit Final design plans to include 2 half size sets, I PDF <br />copy and I copy of the drawings in AutoCAD). <br />• Internal management during the design phase of the project. <br />Bid Phase — LAN will assist the City in bidding the project to Contractors. The detailed scope <br />includes: <br />• Attend the pre -bid conference. <br />• Respond to Contractor questions regarding the bid set. Assumes up to two (2) addenda will <br />be issued. <br />• Assist the City in opening and review of the bids and prepare a recommendation of award <br />letter to the City. <br />Attachment A <br />Page 2 of 4 <br />