My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-100/Agreement w/Lockwood, Andrews & Newnamfor professional engineering services w/North LBJ Lift Station Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-100/Agreement w/Lockwood, Andrews & Newnamfor professional engineering services w/North LBJ Lift Station Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 10:03:42 AM
Creation date
7/17/2013 9:26:22 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-100
Date
7/2/2013
Volume Book
198
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N. LBJ Lift Station <br />Generator Re- Design <br />As noted in the Design Phase discussion, the current generator is anticipated to be re -used as part of <br />the new lift station. This could pose a limitation on the size of the pumps that can be used in the <br />station and therefore, after analysis provided by LAN in the preliminary phase, the City may choose <br />to increase the pump size and generator size on the project. The supplemental services will include: <br />• Sizing of generator and related electrical conductors, conduit and disconnects. <br />• Preparation of specifications for the new generator. <br />• Design of new structural pad for the generator. <br />• Construction phase services (submittal review, RFIs) associated with the new generator. <br />Inspection Services <br />LAN will assist the City with to be determined inspection services for the lift station. Inspections <br />may include coatings inspections, electrical inspections or other inspections that are determined to be <br />needed by the City. The specific inspection services will be identified prior to the bidding phase of <br />the project. <br />WE <br />Attachment A <br />Page 4 of 4 <br />(D tyA, <br />
The URL can be used to link to this page
Your browser does not support the video tag.