Laserfiche WebLink
<br /> CONTRACTOR'S PROPQSAL <br /> <br /> SAN MARCOS p~AY CULVERT REPLACEMENT <br /> <br /> Item Spec Est. Unit Description Unit Price Total Price <br /> No. Item # Quan. in Figures in Figures <br /> ---- <br /> 1. 591-F 80.8 S'i 4ft Concrete Rip Rap $ 36.00 $ 2908.80 <br /> per square yard, compl. <br /> in place. <br /> The sum of Thi rty-s i x <br /> <br /> <br /> dollars and no <br /> cents per square yard. <br /> 2. 559 37.5 LF Installation of 2 - 9'x $ 475.00 $ 17 ~812. 50 <br /> 6' RCB, including <br /> excavation and embedment, <br /> per linear <br /> ~OOä.Tr~ sum of Four <br /> un re eventy~ lye <br /> <br /> dollars and no <br /> cents per linear foot. <br /> 3. 704 200 LF Metal Beam Guard Rail $ 22.50 $ 4,500.00 <br /> including terminal end <br /> section, complete in <br /> place. Twenty-two <br /> The sum of <br /> <br /> Flfty <br /> dollars and <br /> cents per linear foot. <br /> 4. TOOT 2 EA Headwall with parallel $ 10~5Q.9..Q9 $--_?~ tg~.g_: O~._- <br /> 475 wingwall complete ín <br /> place. <br /> T~e sum ~f Ten <br /> t ousand lve hundred <br /> <br /> dollars and no <br /> cents per each. <br /> TOTAL PRICE - LABOR $ 34,221. 30 <br /> TOTAL PRICE - MATERIALS$ 12~OOo.oO <br /> Forty-six TOTAL CONTRAC~ PRrcE$ 46,221. 30 <br /> dollars and thirty ceht~ <br /> <br /> -3- <br />