Laserfiche WebLink
<br />O.l STANDARDS OF PERFORMANCE <br /> <br />0.1.1 <br /> <br />with <br /> <br />skill <br /> <br />possess <br /> <br />project. <br /> <br />In the performance of all engineering services in connection <br /> <br />this <br /> <br />Agreement, <br /> <br />the <br /> <br />Engineer shall use that degree of care and <br /> <br />ordinarily <br /> <br />exercised <br /> <br />for <br /> <br />similar <br /> <br />projects <br /> <br />by <br /> <br />Engineers who <br /> <br />special <br /> <br />expertise <br /> <br />in <br /> <br />the <br /> <br />type <br /> <br />of <br /> <br />involved <br /> <br />work <br /> <br />in this <br /> <br />1.1 PRELIMINARY PHASE <br /> <br />Engineer shall: <br /> <br />1.1.1 <br /> <br />staff, <br /> <br />Attend one (1) meeting with City staff to evaluate needs of <br /> <br />system <br /> <br />characteristics <br /> <br />and <br /> <br />operations <br /> <br />and <br /> <br />maintenance <br /> <br />1.1.2 <br /> <br />procedures. <br /> <br />1.1.3 <br /> <br />any <br /> <br />Review with owner alternative approaches and systems. <br /> <br />Establish scope of any soil and foundation investigations or <br /> <br />special <br /> <br />surveys <br /> <br />and tests which, in the opinion of the Engineer, <br /> <br />1.1.4 <br /> <br />may be required. <br /> <br />Prepare <br /> <br />a <br /> <br />preliminary engineering report on the Project in <br /> <br />sufficient <br /> <br />detail <br /> <br />to <br /> <br />clearly <br /> <br />identify <br /> <br />the <br /> <br />Engineer's <br /> <br />recommended <br /> <br />River <br /> <br />alternative <br /> <br />flows across the San Marcos <br /> <br />for <br /> <br />transporting <br /> <br />wastewater <br /> <br />and, <br /> <br />subsequently <br /> <br />to the wastewater treatment plant, projected <br /> <br />1.1.5 <br /> <br />construction costs and construction time. <br /> <br />Furnish <br /> <br />the Owner four (4) copies of the preliminary report <br /> <br />including cost estimates. <br /> <br />1.2 DESIGN PHASE <br /> <br />1.2.1 <br /> <br />Engineer shall: <br /> <br />estimates <br /> <br />have <br /> <br />have <br /> <br />Prior <br /> <br />to <br /> <br />pre-design <br /> <br />conference with Owner, review cost <br /> <br />a <br /> <br />presented <br /> <br />in <br /> <br />the <br /> <br />preliminary report to determine if costs <br /> <br />materially <br /> <br />changed <br /> <br />since <br /> <br />publication. <br /> <br />If significant changes <br /> <br />occurred, <br /> <br />the <br /> <br />Engineer <br /> <br />will <br /> <br />provide <br /> <br />written <br /> <br />revised <br /> <br />cost <br /> <br />estimates to the Owner. <br /> <br />-2- <br />