Laserfiche WebLink
<br />1. 3.7 <br /> <br />not <br /> <br />be <br /> <br />s'3quences <br /> <br />connection <br /> <br />The <br /> <br />Engineer <br /> <br />shall not have control or charge of and shall <br /> <br />responsible <br /> <br />for <br /> <br />construction <br /> <br />methods, <br /> <br />techniques, <br /> <br />means, <br /> <br />or <br /> <br />procedures, <br /> <br />or <br /> <br />for <br /> <br />safety precautions and programs in <br /> <br />with the Work, for the acts or omissions of the Contractor, <br /> <br />for <br /> <br />the <br /> <br />Sub-contractors <br /> <br />any <br /> <br />with <br /> <br />or <br /> <br />other <br /> <br />persons performing any of the Work, or <br /> <br />failure <br /> <br />of <br /> <br />any <br /> <br />of them to carry out the Work in accordance <br /> <br />are <br /> <br />due <br /> <br />the construction contract documents unless such acts or omissions <br /> <br />the <br /> <br />to <br /> <br />negligence of the Engineer or are acts or omissions under <br /> <br />Engineer's <br /> <br />its <br /> <br />authority <br /> <br />during <br /> <br />sequences <br /> <br />in <br /> <br />general <br /> <br />During <br /> <br />on-site <br /> <br />Paragraph <br /> <br />methods, <br /> <br />which, <br /> <br />project <br /> <br />or <br /> <br />which <br /> <br />shall <br /> <br />this <br /> <br />control. <br /> <br />However, <br /> <br />Engineer <br /> <br />shall <br /> <br />exercise <br /> <br />on <br /> <br />behalf <br /> <br />of Owner in accordance herewith and particularly <br /> <br />the <br /> <br />construction phase so that the means, methods, techniques, <br /> <br />and procedures of construction result in a project completed <br /> <br />accordance <br /> <br />with <br /> <br />the <br /> <br />construction <br /> <br />contract <br /> <br />documents. <br /> <br />the <br /> <br />construction <br /> <br />phase <br /> <br />should <br /> <br />Engineer, <br /> <br />by exercising such <br /> <br />professional <br /> <br />observation <br /> <br />responsibilities <br /> <br />provided <br /> <br />in <br /> <br />as <br /> <br />1.3.6, <br /> <br />become <br /> <br />aware <br /> <br />of Contractor's utilization of means, <br /> <br />techniques, <br /> <br />and/or <br /> <br />procedures <br /> <br />sequences <br /> <br />of <br /> <br />construction <br /> <br />in <br /> <br />Engineer's <br /> <br />opinion, <br /> <br />will <br /> <br />not result in completion of the <br /> <br />in general accordance with the construction contract documents <br /> <br />are <br /> <br />unsafe, <br /> <br />Engineer shall immediately so inform Owner and <br /> <br />take all necessary action which the Engineer is authorized under <br /> <br />Agreement to take to correct the matter. <br /> <br />In such situations, the <br /> <br />Engineer <br /> <br />shall <br /> <br />shall <br /> <br />immediately <br /> <br />notify <br /> <br />the Contractor and the Owner, who <br /> <br />have <br /> <br />the <br /> <br />right <br /> <br />and <br /> <br />immediately <br /> <br />to <br /> <br />cease tha work by <br /> <br />power <br /> <br />1.3.8 <br /> <br />Contractor on the project. <br /> <br />Engineer <br /> <br />The <br /> <br />shall <br /> <br />all <br /> <br />times have access to the Work <br /> <br />at <br /> <br />wherever it is in preparation or progress. <br /> <br />-6- <br />