Laserfiche WebLink
<br />not <br /> <br />conform <br /> <br />to the construction contract documents. <br /> <br />Whenever, in the <br /> <br />Engineer's <br /> <br />opinion, <br /> <br />it <br /> <br />is <br /> <br />necessary <br /> <br />or <br /> <br />advisable <br /> <br />for <br /> <br />the proper <br /> <br />implementation <br /> <br />of <br /> <br />the <br /> <br />intent of the construction contract documents, <br /> <br />and <br /> <br />with <br /> <br />the <br /> <br />approval <br /> <br />of <br /> <br />the <br /> <br />Owner, <br /> <br />the <br /> <br />Engineer <br /> <br />will have the <br /> <br />authority <br /> <br />to <br /> <br />require <br /> <br />special <br /> <br />inspections <br /> <br />or testing of the Work in <br /> <br />accordance <br /> <br />with the provisions of the construction contract documents, <br /> <br />whether <br /> <br />or <br /> <br />not <br /> <br />such Work be then fabricated, installed or completed. <br /> <br />The <br /> <br />Engineer <br /> <br />shall monitor and review results of testing laboratories <br /> <br />as customarily required for similar projects. <br /> <br />1.3.12 <br /> <br />The <br /> <br />Engineer shall thoroughly review and make all decisions <br /> <br />regarding <br /> <br />the <br /> <br />approval or taking of other appropriate action upon the <br /> <br />Contractor's <br /> <br />submittals, <br /> <br />including but not limited to, shop drawings, <br /> <br />catalog <br /> <br />data <br /> <br />and <br /> <br />samples, <br /> <br />schedules, <br /> <br />and laboratory, shop and mill <br /> <br />tests <br /> <br />of <br /> <br />material, <br /> <br />equipment, <br /> <br />software documentation and other data <br /> <br />submitted <br /> <br />by <br /> <br />Contractor, <br /> <br />furnishing <br /> <br />Owner with copies of same. Such <br /> <br />action <br /> <br />shall be taken with reasonable promptness, but generally not to <br /> <br />exceed <br /> <br />fifteen <br /> <br />(15) <br /> <br />days or such period of time which will not cause <br /> <br />delay of the project. <br /> <br />1.3.13 The Engineer shall prepare Change Orders for the Owner's <br />approval and execution in accordance with the construction contract <br />documents, but shall not issue change orders not previously approved <br /> <br />in <br /> <br />writing <br /> <br />by Owner, and no course of conduct on the part of Engineer <br /> <br />or <br /> <br />Owner <br /> <br />shall <br /> <br />act <br /> <br />to <br /> <br />amend, <br /> <br />waive <br /> <br />or <br /> <br />alter this provision. <br /> <br />If <br /> <br />additive <br /> <br />Change Orders are required as a result of any error(s) and/or <br /> <br />omission{s) <br /> <br />of Engineer as determined by Owner, Engineer shall, within <br /> <br />thirty <br /> <br />(30) <br /> <br />days <br /> <br />of <br /> <br />receipt <br /> <br />of <br /> <br />an <br /> <br />invoice <br /> <br />therefor <br /> <br />from Owner, <br /> <br />reimburse Owner in an amount equal to ten percent (10%) of the amount <br /> <br />-8- <br />