Laserfiche WebLink
<br /> City of San Marcos <br /> April 30, 1990 <br /> Pag¿ 4 of 6 <br /> PROFESSIONAL SERVICE INDUSTRIES, INC. <br /> PROJECT DATA SHEET <br /> SUBSURFACE EXPLORATION <br /> 1. Project Name: Runway 8-26 <br /> <br /> 2. Project Location: San Marcos, Texas <br /> <br /> 3. Your Job No. : Purchase Order No. : <br /> <br /> 4. Project Manager: Telephone No. : <br /> <br /> 5. Number and Distribution of Reports: <br /> ( ) Copies To: ( ) Copies To: <br /> <br /> <br /> Attn.: Attn.: <br /> <br /> 6. Invoicing Address: <br /> <br /> <br /> Attn.: <br /> <br /> 7. Type of Structure: Number of Floors: <br /> <br /> 8. Special Equipment or Installation: <br /> <br /> 9. Interior Column Spacing: Exterior Column Spacing: <br /> <br /> 1O. Exterior Column Load: Live: Dead: <br /> <br /> 11. Interior Column Load: Live: Dead: <br /> <br /> 12. Floor Slab Load: Slab on Grade: Basement/Depth: <br /> <br /> 13. Will elevation of site be raised by filling: How Much: <br /> <br /> 14. Septic Tank: Storm Water Drainage: <br /> <br /> 15. Pavement Type: Traffic Load: Traffic Type: <br /> <br /> 16. Other pertinent information: <br /> <br /> <br /> 17. Is there any previous subsurface information available: <br /> <br /> <br /> PSI 8-900-12 (1) <br />