Laserfiche WebLink
<br /> City of San Marcos <br /> April 30, 19.90 <br /> Page 5 of 6 <br /> PROFESSIONAL SERVICE INDUSTRIES, INC. <br /> SHILSTONE ENGINEERING TESTING LABORATORY DIVISION <br /> SCHEDULE OF SERVICES AND FEES. SUBSURFACE EXPLORATION <br /> EFFECTIVE JANUARY " 1990 <br /> Eng\neer\n~ <br /> . Engineering and technical services lor preliminary reconnaissance, boring <br /> layout, delayed water levels, backfilling 01 borin~s. evaluation, field super- <br /> vision, analysis, recc'11mendations, reporting an consultation. Per Hour $ 70.00 <br /> Senior Project Engineer............................................ <br /> Project Engineer......................................................, Per Hour $ 52. 00 <br /> Stall Engineer.......................................... ............... Per Hour $ 42.00 <br /> EngineeringTechnician................................................ Per Ho'l~ $ 22 . 00 <br /> Drilling <br /> Mo ilization and moving of drilling equipment on and oil site each way... ... Per Mile $ 1.55 <br /> Minimum $ 90.00 <br /> Use of ail-terrain quoted on request. <br /> Auger drilling without sampling: <br /> Depth Range Unit Charges <br /> Feet Solf Drilling Rock Coring <br /> 0-25..................................... $ 7.50 pI! $16.00 pI! <br /> 25-50................ """""""'" ... $ 8.00 pI! $19.00 pI! <br /> 50-100!.................................. $ 9.00 pI! $26.00 plf <br /> 100+.................................... Quoted Upon Request <br /> Soil sampling as required with split-barrel or thin wall tube (Shelby tube) <br /> sampler: <br /> Depth Range Unit Charges <br /> Feet <br /> 0-25...... ......... """"""""'" ... $ 9.00 per sample <br /> 25-50................ """""""""" $12.00 per sample <br /> 50-100 ...........................,...... $19.00 per sample <br /> 100+.................................... Quoted Upon Request <br /> Special andlor insitu testing: <br /> Stalic Cone Penetrometer..........................................:.. PI! $ 4.75 <br /> Dennison or Piston Sampler .................. ..........,.............. Each $ 31.50 <br /> VaneShearTest....................................................... Per Hour $ 95.00 <br /> Pressure Tesling Rock................................................. Per Hour $ 95.00 <br /> Other ¡nsitu testinç¡ with special equipment...................... ...... Quoted Upon <br /> Request <br /> Set-up charge for rock coring... . . . . . .. . . . . .. .. . . . . .. .. .... . . .. .... . . . . . . . Per Hole $ 60.00 <br /> Cost of special equipment or permits for moving drilling equipment about the <br /> site....................................................................... At Cost Plus 15% <br /> Set-up time per hole, In excess 01112 hour, or stand by Nme ............... Per Hour $ 90.00 <br /> Testing <br /> Visual classification................................... .................... Each $ 3.00 <br /> Moistureconlenttests............,.......................,............... Each $ 3.25 <br /> Density determinations..... ..............,................................ Each $ 15.75 <br /> Hand penetrometer tests """""""""""""""""""""""'" Each $ 3.25 <br /> Unconfined compressior, tests wlo stress versus strain curve............. Each $ 20.00 <br /> AHerberg limits de\ermina\\on........................ ..................,.. Each $ 38.00 <br /> Percenlswelltests........................................,............... Each $ 75.00 <br /> Swell pressure tests..................................... .,............... Each $105.00 <br /> Permeability testing <br /> a. Failing head......................................................... Each $155.00 <br /> b. Constant head """"""""""""""""""""""""""" Each $115.00 <br /> Grain size analysis, mechanical........................................... Each $ 47.00 <br /> Percent passing #200 sieve.............................................. Each $ 21.00 <br /> Consolidation.............................................,............... Each $325.00 <br /> Triaxial shear testing <br /> a. Unconsolidated-undrained.......................................... Per Point $ 80.00 <br /> b. Consolidated-undrained............................................. Per Point $110.00 <br /> c. Consolidated-drained """"""""""""""""""""""'" Per Poin! $170.00 <br /> Moisture-density relationship <br /> a. ASTMD-698(Standard Proctor)................. """"""""','F Each $110.00 <br /> b.. ASTM 0-1557 (Modified Proctor).................................... Each $120.00 <br /> California Bearing Ratio, wlo moisture-density relationship. . ... . . . . . . .... Each $185.00 <br /> Remarks <br /> Services and lees not listed above will be quoted on request. <br /> A transportation charge of $0.35 per mile and per diem charge of $45.00 per day will be added, if applicable. <br /> ~~ <br />