My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-114/Approving an Interlocal Agreement with the CAPCOG for Solid Waste Equipment and Services
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-114/Approving an Interlocal Agreement with the CAPCOG for Solid Waste Equipment and Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2013 11:24:19 AM
Creation date
8/21/2013 3:38:18 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-114
Date
8/6/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
adequately monitor the SUBCONTRACTOR's progress in completing the requirements of and <br />adhering to the provisions of this Contract. <br />(c). The SUBCONTRACTOR will certify in writing to CAPCOG through a final progress report, the <br />satisfactory completion of all activities and deliverables required under this Contract. The <br />final progress report shall consist of the forms descri bed in Section A of thi s Arti cl e 4. <br />(d). The SU BCO NTRACTO R shal I mai ntai n the i nformati on requi red by the forms I i sted i n Part (a) <br />of this Section so that a follow -up results report can be prepared. The SUBCONTRACTOR <br />shall provide CAPCOG with a follow -up Progress Reporting Form to be due approximately <br />September 2014 so that CAPCOG can report to the TCEQ the results of the projects funded <br />under this Contract. <br />(e). The SUBCONTRACTOR'S failure to comply with the requirements of this Article shall <br />constitute a breach of this Contract. <br />(f). The SUBCONTRACTOR shall maintain documentation on the results of the project activities <br />for the life of the program or activity. <br />(g). The reporting requirements of this Article 4 survive the ending or early termination of this <br />Contract. <br />Article 5: Monitoring Requirements <br />(a). CAPCOG may periodically monitor SUBCONTRACTORfor: <br />1. The degree of compliance with the terms of this Contract, including compliance with <br />applicable rules, regulations, and promulgations referenced herein; and <br />2. The administrative and operational effectiveness of the project. <br />(b). CAPCOG shall conduct periodic analysis of SUBCONTRACTOR'S performance under this <br />Contract for the purpose of assessing the degree to which contractual objectives and <br />performance standards, as identified in this Contract or as subsequently amended, are achieved <br />by SU BCO N TRACTO R. <br />Article 6: Title To and Management of Real Property and Equipment <br />(a). Subject to the obligations and conditions set forth in this Agreement, title to real property and <br />equipment (together hereafter referred to in this Article as "property ") acquired under this <br />Agreement by the SUBCONTRACTOR will vest upon acquisition or construction in CAPCOG <br />or the SU BCO N TRACTO R respecti vel y. <br />(b). Subject to the provisions of this Agreement, and as otherwise provided by state statutes, <br />property acquired or replaced under this Agreement shall be used for the duration of its <br />CAPCOG FY2012 Solid Waste Interlocal Contract 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.