Subpart B - LAND DEVELOPMENT CODE <br />Chapter 1 - DEVELOPMENT PROCEDURES <br />ARTICLE 7: - WATERSHED PROTECTION PLANS <br />DIVISION 1: -APPROVAL AND APPLICATION PROCESS; APPEALS <br />d. Final Subdivision Plat, <br />Final Development Plat. <br />(3) The Watershed Protection Plan (Phase 2) shall be consistent with the Watershed Protection Plan (Phase 1). An <br />applicant may elect to submit a Watershed Protection Plan (Phase 2) in lieu of a Watershed Protection Plan <br />(Phase 1). <br />(b) Prior Approvals. An application for a Watershed Protection Plan (either phase), shall not be approved until all <br />petitions for legislative decisions authorizing the use of or provisions of services to the property have been approved <br />and remain in effect for land to be subject to the Watershed Protection Plan (either phase). An application for a <br />Phase 2 Watershed Protection Plan shall not be approved or approved with conditions prior to formal acceptance by <br />FEMA of any required Conditional Letter of Map Revision. <br />(c) Subsequent Approvals. No plat application, Site Preparation Permit, or construction permit shall be approved unless <br />a required Watershed Protection Plan, either phase as applicable, has been first approved for the land subject to the <br />application. <br />(d) Accompanying Applications. <br />(1) A Watershed Protection Plan (Phase 1) may be accompanied by an application for a Cluster Development Plan. <br />(2) For land that is to be divided before development, an application for a Watershed Protection Plan (Phase 1) may <br />be accompanied by an application for approval of a Subdivision Concept Plat or Preliminary Subdivision Plat. <br />(3) An application for a Watershed Protection Plan (Phase 2) may be accompanied by an application for approval of <br />a Final Subdivision Plat. <br />(4) If a plat already has been approved or is not required for development of the land, an application for a <br />development plat (preliminary or final) or Site Preparation Permit may be submitted with the application for a <br />Watershed Protection Plan (Phase 2). <br />(5) In any case, the Watershed Protection Plan (Phase 1 or Phase 2 as applicable) shall be decided first. <br />Section 1.7 1...3 ,,. AppIllicatiloin Requirements <br />(a) Responsible Official. The Engineering Director shall be the responsible official for an application for a Watershed <br />Protection Plan, Phase 1 and Phase 2. The II 24aRr;aRiq DDirector shall advise and assist the Engineering Director in <br />evaluating the application and preparing reports for the Planning and Zoning Commission or the City Council on <br />appeal. <br />(b) Contents. An application for approval of a Watershed Protection Plan, Phase 1 and Phase 2, shall be prepared in <br />accordance with Chapter 1 of the Technical Manual. Where land within a floodplain is proposed to be reclaimed, a <br />Reclamation Concept Plan prepared in accordance with the Technical Manual also must be approved as an element <br />of both phases of the Watershed Protection Plan. <br />Section 1 „7 „1„ 4 ,,. Pirocessiling of AppIllicatiloin and IlD iii iiion <br />(a) Decision by Type of Watershed Protection Plan. An application for approval of a Watershed Protection Plan, Phase 1 <br />and Phase 2, initially shall be decided by the Engineering Director, except where the application is accompanied by <br />any of the following requests, in which case the application shall be construed as an application for a Qualified <br />Watershed Protection Plan, which shall be decided by the Planning and Zoning Commission following a <br />recommendation by the City Engineer: <br />(1) A petition for a variance from water quality standards under Section 1.7.1.6 <br />San Marcos, Texas, Code of Ordinances Page 105 <br />