My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-067
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2007 3:50:46 PM
Creation date
7/23/2007 3:50:46 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-67
Date
6/25/1990
Volume Book
98
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Orientation Meeting <br /> A meeting with the staff of the THC will be required for all grant recipients <br /> shortly after the grant award is announced. The project supervisor, project <br /> pTofessional, and the gTsnt recipient's fiscal offi~er will be required to <br /> attend. The purpose of the meeting is to establish survey priorities and a <br /> timetable for completion, and to formalize the budget and reimbursement <br /> procedures. <br /> A time and date for the meeting will be arranged following submittal of the <br /> Request for Funding, approval of the grants by the THC, and issuance of awård <br /> letters. <br /> No work should begin prior to the orientation meeting and r~ceipt by the Texas <br /> Historical Commission of a signed written contract. <br /> Project raple..ntation <br /> Project Contract - a contractual agreement (approved by the State Attorney <br /> General) specifying the approximate scope of work, a timetable for completion and <br /> budgetary concerns will be prepared by the THC on the basis of the Project <br /> Proposal and the subsequent consultations with the grant recipient. The <br /> agreement must be signed by the parties involved prior to commencement of work. <br /> Reimbursement - all payments to the grant recipient will be strictly on a <br /> reimbursement basis, and all payments will be on a one-to-one match. Invoices and <br /> cancelled checks for total payment to the project professional(s) should be <br /> submitted by the grant recipient; one-half of these totals will then be <br /> reimbursed to the grant recipient.(See "assurances," p. 13) <br /> Reimbursement can be requested monthly, quarterly, or as a lump sum at the <br /> completion of the project. The following project documentation must be submitted <br /> to the THC in order for reimbursement to be considered: <br /> 1) Procurement documents (invitation to bid, proposals received, statement <br /> explaining selection of project professional). <br /> 2) Signed contractual agreement (contract signed by the parties involved <br /> after the Project Proposal has been approved). <br /> 3) Assurances - each request for reimbursement submitted to the THC must <br /> contain: <br /> a) a letter requesting reimbursement which lists the number of the <br /> request (first, second, third, etc.), time period in which costs <br /> were incurred, and costs currently listed. <br /> b) verification of each cost currently claimed. This will include <br /> copies of statements, and if in-kind contributions are made, <br /> copies of timesheets signed by both the employee (or volunteer) <br /> and supervisor. <br /> c) verification of each corresponding payment (copies of cancelled <br /> checks). <br /> 4) Monthly progress reports, due to the Commission by the 10th day of the <br /> following month. <br /> The Commission will then reimburse the grant recipient for one-half <br /> of the documented allowable expenditures made during the project <br /> period covered by the request. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.