Laserfiche WebLink
<br /> EXHIBIT A <br /> PERFORMANCE STATEMENT <br /> City of San Marcos <br /> Contractor shall carry out the following activities in the target area(s) identified on the map in <br /> its 1988 Economic Development application: <br /> Project Description <br /> <br /> The purpose of this Economic Development project is to provide a water line to enable CTEC <br /> to start-up operations in the city of San Marcos. CTEC will manufacture composite technology <br /> engine components to be utilized in commercial and military aircraft. <br /> Financial Information <br /> Contractor shall utilize Five Hundred Thousand and No/100 Dollars ($500,000) of contract <br /> funds and Thirty-one Thousand Sixty-eight and No/100 Dollars ($31,068) of local funds to extend <br /> a water line as specified hèrein to CTEC's facility in the city of San Marcos. The facility shall be <br /> located on the east side of Interstate Highway 35 (IH-35) on the north end of the city of San <br /> Marcos. <br /> Contractor shall utilize Three Hundred Twenty-two Thousand Two Hundred Nine and No/100 <br /> Dollars ($322,209) of local funds to carry out all acquisition of needed real property, easements <br /> and/or rights-of-way in compliance with the Uniform Relocation Assistance and Real Property <br /> Acquisition Policies Act of 1970 (42 U.S.C. Sec. 4601 etseq.) and HUD. implementing regulations <br /> (49 C.F.R. Part 24). <br /> The infrastructure improvements shall consist of approximately thirteen thousand eight hundred <br /> feet (13,800 ft.) of sixteen-inch (16") water line which shall connect to an existing sixteen-inch (16") <br /> line along the east side of IH-35 (next to the Butler facility). The water line shall cross IH-35 at <br /> that approximate location then travel north parallel to IH-35 and cross the Blanco River and <br /> continue on to the CTEC location. The water line shall contain nine (9) sixteen-inch (16") valves, <br /> six (6) fire hydrants, four (4) air release valves, and one (1) pump modification and automatic <br /> controls. <br /> Contractor shall ensure that CTEC utilizes a minimum equity injection from machinery and <br /> equipment of Two Million Forty Thousand and No/100 Dollars ($2,040,000) for this project as <br /> follows: Six Hundred Forty Thousand and No/100 Dollars ($640,000) for the acquisition of a ten <br /> feet by twenty feet (10ft. x 20 ft.) autoclave and One Million Four Hundred Thousand and No!100 <br /> Dollars ($1,400,000) for five (5) Axis CNC Mills. <br /> Page 1 of 2 <br />