Laserfiche WebLink
<br /> 1'33 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 13 <br /> POTABLE WATER SYSTEM <br /> 13-07 GUARANTEE: <br /> a. It shall be the Contractor's responsibility to insure and <br /> guarantee the satisfactory operation of the entire system and the <br /> workmanship and restoration of the area. The entire system shall <br /> be guaranteed to be complete and perfect in every detail for a <br /> period of one year from the date of its acceptance, and he HEREBY <br /> AGREES to repair or replace any such defects occurring within that <br /> year, free of expense to the Owner. <br /> 13-06 MEASUREMENT AND PAYMENT: <br /> a. RIO VISTA ANNEX POTABLE WATER SYSTEM shall be installed as <br /> provided above from and including dry tap at existing water main <br /> to and including connection to the stubout of the building, as <br /> shown on the drawings. <br /> b. RAMON LUCIO POTABLE WATER SYSTEM shall be installed as <br /> provided above from and including wet tap at existing water main <br /> to and including 2"x2"xl" tee for connection to the drinking <br /> fountain. Cap 2" end of tee for future stubout, as shown on the <br /> drawings. <br /> c. No separate payment will be made for s.~kin'J., excavation <br /> and backfill (including excavation and backfill by hand in areas <br /> where other ut11iti.- dr. located), connections, fittings, <br /> adapters, specials # reducers, thru.8t blocks (concrete), valves, <br /> valve boxes, installing pipe, pipe sleeves, flushing, pressure <br /> testing, sterilizinq, to install a complete and operable water <br /> system as indicated on the plans, but all such items shall be <br /> considered to be subsidiary work pertaining to the itea bid. <br /> d. RIO VISTA ANNEX POTABLE WATER SYSTEM acceptably completed <br /> as provided above, will be paid for at the contract lump sum price <br /> bid for RIO VISTA ANNEX POTABLE WATER SYSTEM, wnich price shall be <br /> full compensation for furnishing all materials and equipment, <br /> making all taps and connections, and for all equ~pment, tools, <br /> labor, and incidentals necessary to complete the work. <br /> 13-4 <br />