My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 83 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION lA <br /> MOBILIZATION <br /> lA-al SCOPE: <br /> a. The work shall consist of the mobilization of the <br /> Contractor' s forces and equipment necessary for performing the work <br /> required under the contract. <br /> It shall include the purchase of contract bonds; <br /> transportation of personnel, equipment, and operating 8upplies to <br /> the site; establishment of offices, buildings, and other neces8ary <br /> facilities at the site; and other preparatory work at the site. <br /> It shall also include the nece8sary coats to bring electrical <br /> power and telephone service to Inspector's trailer and the <br /> connected service coat thereof (except for long distance phone <br /> calla) for the duration of the project. The Inspector trailer <br /> location shall be at the Ra8on Lucio Park site where shown on <br /> drawings sheet 3. <br /> It shall not include mobilization for any specific item of <br /> work for which paJ88nt for IIObilization is provided elsewhere in <br /> the contract. <br /> b. The specification covers mobilization for work required by <br /> the contract at the ti8e of award. If additionalllObilization coats <br /> are incurred during perforJlance of the contract ae a result of <br /> changed or added it- of work for which the Contractor is entitled <br /> to an adjust88nt in contract price, c08p8l18ation for such eosts <br /> will be included in the price adju8taaent for the it- of work <br /> changed or added. <br /> lA-O2 PAYDJI'fa <br /> a. PaY88nt will be _de a8 the work proceed8. Total <br /> payaant will be the luap 8ua contract price for JfOBILIZATIOB, <br /> regardl.ss of actual CO8t to the Contractor. <br /> lA-! <br />
The URL can be used to link to this page
Your browser does not support the video tag.