My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 223 <br /> RAMON IiUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 19 <br /> EROSION CONTROL <br /> No separate measurement shall be made for excavation, preparation, <br /> crushed rock, periodic maintenance, removal and disposal of silt, <br /> repairs and replacement, and final disposal of structure, but will <br /> be considered subsidiary work pertaining to the item bid. <br /> c. PERMANENT EROSION CONTROL (HYDRO MULCH SEEDING) shall be <br /> measured for payment by the acre or one tenth part thereof (to the <br /> nearest tenth acre). No separate measurement shall be made for <br /> placement of 4" topsoil for (stockpiled topsoil) seed, hydromulch <br /> media, water and watering effort, placement of mixture, <br /> maintenance, repairs or replacement, but will be considered <br /> subsidiary work pertaining to the item bid. <br /> d. FERTILIZER shall be measured for payment by the 100 lb. <br /> unit. No separate measurement shall be made for placement and <br /> broadcasting, and mixing with hydromulch seeding, but will be <br /> considered subsidiary work pertaining to the item <br /> e. TEMPORARY EROSION CONTROL (SILT FENCE) acceptably <br /> completed and measured as provided above, will be paid for at the <br /> contract unit price per lineal foot bid for TEMPORARY EROSION <br /> CONTROL (SILT PENCE), which price shall be full compensation for <br /> furnishing all materials, and for. all equipment, tools, labor, and <br /> incidentals necessary to complete tbework. <br /> f. TEMPORARY .EROSION CONTROL (ROCK BERM) acceptably completed <br /> and measured as provided above, will be paid for at the contract <br /> unit price per lineal foot bid for TEJlPORARY EROS¡ON CONTROL (ROCK <br /> BERM), which price shall be full compensation for furnishing all <br /> materials, and for all equipment, tools, labor, and inc identals <br /> necessary to complete the work. <br /> g. PERMANENT EROSION COH'l'ROL (HYDRO MULCH SEEDING) acceptably <br /> completed and measured as provided above, will be paid for at the <br /> contract unit price per one tenth acre (0. 1 acre) bid for PERMANENT <br /> EROSION CONTROL (HYDRO MULCH SEEDING), which price shall be full <br /> compensation for furnishing all materials, and for all equipment, <br /> water, tools, labor, and incidentals necessary to complete the <br /> work. <br /> 19-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.