Laserfiche WebLink
<br /> 223 <br /> RAMON IiUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 19 <br /> EROSION CONTROL <br /> No separate measurement shall be made for excavation, preparation, <br /> crushed rock, periodic maintenance, removal and disposal of silt, <br /> repairs and replacement, and final disposal of structure, but will <br /> be considered subsidiary work pertaining to the item bid. <br /> c. PERMANENT EROSION CONTROL (HYDRO MULCH SEEDING) shall be <br /> measured for payment by the acre or one tenth part thereof (to the <br /> nearest tenth acre). No separate measurement shall be made for <br /> placement of 4" topsoil for (stockpiled topsoil) seed, hydromulch <br /> media, water and watering effort, placement of mixture, <br /> maintenance, repairs or replacement, but will be considered <br /> subsidiary work pertaining to the item bid. <br /> d. FERTILIZER shall be measured for payment by the 100 lb. <br /> unit. No separate measurement shall be made for placement and <br /> broadcasting, and mixing with hydromulch seeding, but will be <br /> considered subsidiary work pertaining to the item <br /> e. TEMPORARY EROSION CONTROL (SILT FENCE) acceptably <br /> completed and measured as provided above, will be paid for at the <br /> contract unit price per lineal foot bid for TEMPORARY EROSION <br /> CONTROL (SILT PENCE), which price shall be full compensation for <br /> furnishing all materials, and for. all equipment, tools, labor, and <br /> incidentals necessary to complete tbework. <br /> f. TEMPORARY .EROSION CONTROL (ROCK BERM) acceptably completed <br /> and measured as provided above, will be paid for at the contract <br /> unit price per lineal foot bid for TEJlPORARY EROS¡ON CONTROL (ROCK <br /> BERM), which price shall be full compensation for furnishing all <br /> materials, and for all equipment, tools, labor, and inc identals <br /> necessary to complete the work. <br /> g. PERMANENT EROSION COH'l'ROL (HYDRO MULCH SEEDING) acceptably <br /> completed and measured as provided above, will be paid for at the <br /> contract unit price per one tenth acre (0. 1 acre) bid for PERMANENT <br /> EROSION CONTROL (HYDRO MULCH SEEDING), which price shall be full <br /> compensation for furnishing all materials, and for all equipment, <br /> water, tools, labor, and incidentals necessary to complete the <br /> work. <br /> 19-5 <br />