My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 102 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 5 <br /> CONCRETE SLABS, CURB AND GUTTER, AND MISCELLANEOUS CONCRETE <br /> 5-01 GENERAL: <br /> a. All work under this specification is subject to the <br /> applicable Items of the Texas State Department of Highways and <br /> Public Transportation "Standard Specifications for Construction of <br /> Highways, Streets, and Bridges," 1982. <br /> 5-02 SCOPE: <br /> a. This specification shall consist of constructing the <br /> Portland Cement concrete items listed below with reinforcing steel, <br /> subgrade preparation, and finish to the lines, grades and details <br /> as shown on the plans and/or as directed by the Engineer. <br /> (1) Sidewalk <br /> (2) Curb and Gutter <br /> (3) Valley Gutter <br /> (4) Picnic Table Slabs <br /> (5) Driveway <br /> (6) Misc. Post Footings <br /> 5-03 MATERIALS: <br /> a. Concrete shall be Class C in accordance with Specification <br /> 4, Concrete Work - General, of these specifications. Concrete for <br /> post footings only shall be Class B in accordance with <br /> Specification 4, Concrete Work - General, of these specifications. <br /> b. Subgrade preparation shall be in accordance with <br /> Specification 2, Earthwork, and Specification 3, Excavation for <br /> Structures. <br /> c. Reinforcing steel shall be in accordance with the <br /> Specification 4, Concrete Work - General, of these specifications. <br /> d. Expansion joint material shall be preformed bituminous <br /> fiber material pre-cut to the dimensions shown on the plans and to <br /> suit the Concrete Section. Material shall conform to the pertinent <br /> requirements of Texas SDHPT Standard Specifications Item 420.2 <br /> (paragraph 420.2 (2) for Preformed Bituminous or Non-Bituminous <br /> Fiber Material. <br /> 5-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.