My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 109 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 5 <br /> CONCRETE SLABS, CURB AND GUTTER, AND HI SCELLANEOUS CONCRETE <br /> 5-06 MEASUREMENT AND PAYMENT: <br /> a. CONCRETE SIDEWALK will be measured for payment by the <br /> square foot. <br /> b. CONCRETE CURB AND GUTTER will be measured for payment by <br /> the lineal foot. Each continuous section of curb and gutter will <br /> be measured along the back edge of the curb; measurements shall <br /> include the space occupied by expansion joints. <br /> c. CONCRETE VALLEY GUTTER will be measured for payment by the <br /> square foot~ <br /> d. CONCRETE PICNIC TABLE SLABS will each be paid for by the <br /> completed unit. <br /> e. CONCRETE DRIVEWAY will be measured for payment by the <br /> square foot. <br /> f. Post Footings will not be measured for separate payment <br /> but will be considered subsidiary work pertaining to the contract <br /> item. <br /> g. Excavation, Subgrade Preparation, Sand Bedding, Forming, <br /> Reinforcing Steel, Dowels, Ties, Expansion Joints, and Finishing <br /> shall not be measured fo:1; payment but will be subsidiary work <br /> pertaining to the several bid items. <br /> h. CONCRETE SIDEWALK, acceptably completed and measured as <br /> provided above, will be paid for at the contract unit price per <br /> square foot bid for CONCRETE SIDEWALK, which price shall be full <br /> compensation for furnishing all materials including expansion joint <br /> material and reinforcing steel, tie bars; for all excavating, fine <br /> grading, and backfilling; for placing, finishing, and curing; and <br /> for all equipment, tools, labor, and incidentals necessary to <br /> complete the work. <br /> i. CONCRETE CURB AND GU'l'TER, acceptably completed and <br /> measured as provided above, will be paid for at the contract unit <br /> price per linear foot bid for CONCRETE CURB AND GO~ER, which price <br /> shall be full compensation for furnishing all materials including <br /> expansion joint material and reinforcing steel, tie bars; for all <br /> 5-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.