My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 110 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 5 <br /> CONCRETE SLABS, CURB AND GUTTER, AND MISCELLANEOUS CONCRETE <br /> excavating, fine grading, and backfilling; for placing, finishing, <br /> and curing; and for all equipment, tools, labor, and incidentals <br /> necessary to complete the work. <br /> j. CONCRETE VALLEY GUTTER, acceptably completed and measured <br /> as provided above, will be paid for at the contract unit price per <br /> square foot bid for CONCRETE VALLEY GUTTER, which price shall be <br /> full compensation for furnishing all materials including expansion <br /> joint material and reinforcing steel, tie bars; for all excavating, <br /> and fine grading; for placing, finishing, and curing; and for all <br /> equipment, tools, labor f andineidengJ,s necessary to complete the <br /> work. <br /> k. PteHIC TABLa SLABS, acceptably completed as provided <br /> above, will .. paid for at the contract unit price per each bid for <br /> PICNIC TABLB SLABS, .wh!cb,. p:-1œ a-ha1.1 be full compensation for <br /> furnieJdnq all materials itteludlng-tfi:f(n:c::in9 steel, tie bars; for <br /> all exc:a.-.ating, fine ~ au.d.. bAckfilling; for placing, <br /> finisb.i.D9, and curing; and for all equipamt,.. tools, labor, and <br /> incident«ls necessary to complete the work. <br /> 1.. CONCRETE DRIVEWAY, acceptably completed and measured as <br /> provided above, will be paid for at the contract unit price per <br /> square foot bid for CONCRETE DRIVEWAY, which price shall be full <br /> compens.t;i.on for furnishing all materials including expansion joint <br /> matertal cand reinforcing steel, tie bars; for all excavating, fine <br /> gradinc¡-,and backfilling; for placing, f=n" ,.Md ~9; and <br /> for all. Zipment, tools, labor, and - n:t..I1. --.-ky to <br /> complete' work. <br /> 5-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.