My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 142 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 9 <br /> ELECTRICAL WORK - GENERAL <br /> 9-23 GUARANTEE: <br /> a. The entire electrical system shall be guaranteed against <br /> defective material or workmanship for a period of one year from the <br /> date of acceptance by the Owner. <br /> b. Should any trouble develop within the time specified above, <br /> due to faulty material and/or workmanship, the trouble shall be <br /> corrected by the Contractor at no expense to the Owner. <br /> 9-24 CLEANUP: <br /> a. The Contractor shall make final cleanup of all parts of <br /> the work before final acceptance. This cleanup shall include <br /> removal of all construction materials and equipment, and in general <br /> preparing the site in an orderly and finished appearance. <br /> 9-25 MEASUREMENT AND P AYKENT: <br /> a. Electrical Work -General will not be measured for separate <br /> payment but shall be considered subsidiary work pertaining to the <br /> involved items of the contract. <br /> 9-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.