My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> l~S <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 11 <br /> RESTROOM BUILDINGS <br /> 11-01 SCOPE <br /> a. This specification shall include all labor, furnishing all <br /> materials, equipment and services necessary for and reasonably <br /> incidental to the proper completion of the Restroom Building, <br /> including but not limited to all excavation work, backfilling, <br /> compacting, utilities, concrete work, concrete masonry unit work, <br /> brick work, woodwork, metal work, electrical, plumbing, painting, <br /> all as called for on the drawings and included in the <br /> specifications and/or as required for a complete and usable <br /> facility. <br /> b. The Contractor shall personally inspect the site of the <br /> proposed work to become familiar with all conditions under which <br /> the work is to be done. <br /> 11-02 STAKING OUT AND UTILITIES: <br /> a. The Contractor shall be entirely responsible for the <br /> correct staking out of the buildings. He/she shall establish a <br /> permanent benchmark near the building sites and shall run several <br /> axis lines locating the work, establish correct datum levels, and <br /> shall erect in a workmanlike and substantial manner all necessary <br /> stakes, batterboards and so forth. Before proceeding with the work <br /> he/she shall verify all lines with the Engineer or his authorized <br /> representative. <br /> b. The Contractor shall be responsible for connecting the <br /> electrical service. to the restroom building. All interior <br /> electrical work beginning at the underground junction box (junction <br /> box paid for under the corresponding exterior electrical system <br /> bid item) and conduit stubout shall be paid for under the restroom <br /> building bid item. <br /> c. Contractor will stub out sewer line 5' from building slab <br /> as shown on the drawings and install a cleanout. The remainder of <br /> the sewer work will be paid for under the corresponding sanitary <br /> sewer system bid item. <br /> 11-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.