Laserfiche WebLink
<br /> ISO <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 11 <br /> RESTROOM BUILDINGS <br /> d. Potable water will be installed from connections indicated <br /> on the drawings. <br /> Contractor will stub out water line 5' from building line and place <br /> 1 1/4" stop and waste valve as limits for payment under the <br /> restroom building bid. The remainder of the water lines work will <br /> be paid by the corresponding potable water system bid item. <br /> e. Telephone (contractually required for the inspection <br /> trailer), shall be coordinated with the local telephone company. <br /> The only contractual requirement is to stub out from building a 1" <br /> dia. plastic conduit located as shown on the drawings (from a point <br /> past the edge of sidewalk to flush with inside pipe chase wall. <br /> 11-03 EARTHWORK: <br /> a. General: This section includes, but is not limited to, <br /> Excavating, Filling, Backfilling, Grading, and other related items <br /> necessary to complete project as indicated by the documents unless <br /> specifically excluded. See Specification 3 of these specifications. <br /> b. Materials: <br /> ( 1) Select fill material under slabs: Fill material, when <br /> properly slaked and tested by standard laBoratory methods, shall <br /> meet the following requirements. <br /> Retained by 2--1/2. screen O, <br /> Retained by 1-1/2" screen 0-25% <br /> Retained by 3/4" screen 15-55% <br /> Retained by 1/4" screen 45-75% <br /> Retained by Ro. 40 Mesh Sieve 60-90% <br /> Maximum Minimum <br /> Passing Plasticity Plasticity <br /> 40 Mesh Sieve Index Index <br /> a. 25-40% 15 3 <br /> b. 10-25' 20 4 <br /> 11-2 <br /> . <br />