Laserfiche WebLink
<br /> 162 <br /> RAMON ~UCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 11 <br /> RESTROOM BUILDINGS <br /> c. Templates: <br /> ( 1) Furnish necessary templates and template data to <br /> manufacturers of items that are to be fitted with finish hardware. <br /> Furnish data in ample time to avoid delay in work. <br /> (2) Furnish, to suppliers and installers of doors and <br /> frames, data necessary for reinforcing, drilling, tapping, and <br /> installing. <br /> d. Schedule: See drawings for Schedule of Hardware. <br /> 11-12 PAINTING: <br /> a. General: This section includes, but is not limited to t <br /> Finish Painting, and other related items necessary to complete <br /> project as indicated by the documents unless specifically excluded. <br /> b. Materials: <br /> (1) Basic Materials: All materials used under painting <br /> contract are to be as manufactured by an approved manufacturer, and <br /> shall be delivered on the work S"ite in the original sealed <br /> containers. The following are among approved manufacturers: <br /> (a) The Sherwin Williams Company <br /> (b) E.I. DuPont Company <br /> (c) Pittsburgh Paints <br /> (d) Benjamin Moore Paint Company <br /> (e) Pratt' Lambert, Ine. <br /> (f) The Glidden Company <br /> (g) DeVoe' Reynolds Co., Inc. <br /> (h) Valspar Corporation <br /> (i) Jones Blair <br /> (j) Bute <br /> The paint manufacturer selected to be used shall be used generally <br /> throughout the project. Brands shall not be mixed. Only the first <br /> quality professional label of each manufacturer will be approved <br /> and used. <br /> 11-14 <br />