My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 161 <br /> RAMON LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATION 11 <br /> RESTROOM BUILDINGS <br /> application. Such fastenings are to be of suitable size and type <br /> and harmonize with hardware as to material and finish. <br /> (3) Locks: Shall be mortise type, of design and material <br /> as scheduled. Paces shall be rebated, beveled or rounded as <br /> required. Strike lips shall be of length to protect jamb trim <br /> and to project no farther; all strikes shall have wrought boxes. <br /> These details shall positively be shown on the schedule. <br /> (4) Butts: Butts shall be of the class as scheduled on <br /> the drawings. All butts shall have sufficient throw to clear the <br /> door trim, plinth, or cove base¡ but shall have NO MORE THAN 1". <br /> All butts for out opening exterior doors shall have pins held in <br /> place by a set screw which can only be removed while the door is <br /> open. The Contractor shall see that all set screws are in place. <br /> (5) Finishes: Pinish of hardware shall be as scheduled. <br /> (6) Schedules: The successful bidder shall submit six ( 6) <br /> copies of the Pinish Hardware Schedule to the Engineer for <br /> approval. <br /> The Schedule shall be complete in every detail, listing all items <br /> of hardware being furnished and indicating the detailing of all <br /> items. Catalog cuts will be included. <br /> Each item of hardware shall be correlated with the drawings, by <br /> group headings and/or item numbers. <br /> (7) Guarantee: All materials furnished under this <br /> contract shall be guaranteed free from defects in manufacture, <br /> material and workmanship, and shall be capable of performing the <br /> duties required for which they are designed and for a period of one <br /> year after final acceptance. <br /> 11-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.