Laserfiche WebLink
<br /> CONSTRUCTION COST ESTIMATE <br /> DATE: October 29, 1990 Item No.1 <br /> PROJECT: Rehabilitation of Runway 12-30 <br /> Medium Intensity Runway lighting System, <br /> San Marcos Municipal Airport <br /> San Marcos, Texas <br /> PREPARED BY: Michaellynn Moore, P .E. <br /> Item <br /> No. Description Quantity Unit Cost Amount <br /> 1 30 Watt Transformers 85 EACH $ 115.00 $ 9,775 <br /> 2 Connector Kits 85 EACH 30.00 2,550 <br /> 3 Brooks Boxes 73 EACH 85.00 6,205 <br /> 4 Ant Kits 85 EACH 8.00 680 <br /> 5 Replace 7 1/2 KW Regulator 1 loS. 4,350.00 4,350 <br /> 6 Cable Trench 9,000 loF. 0.75 6,750 <br /> 7 5,000 Volt Cable 13,000 l.F. 0.55 7,150 <br /> 8 Counterpoise Wire 9,500 loF. 0.35 3,325 <br /> 9 Test Existing Runway Lighting 1 loS. 4,000 4,000 <br /> Cables <br /> TOTAL CONSTRUCTION COST $44,785 <br /> Engineering 3,500 <br /> Construction Testing 100 <br /> Construction Inspection 1,515 <br /> TOTAL ESTIMATE $49,900 <br />