Laserfiche WebLink
<br /> DATE: October 5, 1990 Item No.5 <br /> PROJECT: Emergency Generator 1or Runway l\ght\ng &. <br /> ILS System <br /> San Marcos Municipal Airport <br /> San Marcos, Texas <br /> PREPARED BY: Michael Lynn Moore, P.E. <br /> Item <br /> No. Description Quantity Unit Cost Amount <br /> 1 Emergency Generator 1 loS. 32,000 $32,000 <br /> Contingencies 3,200 <br /> TOTAL CONSTRUCTION COST $35,200 <br /> Engineering 2,100 <br /> Construction Inspection 1,200 <br /> TOTAL ESTIMATE $38,500 <br />