Laserfiche WebLink
<br /> DATE: October 5, 1990 Item No.6 <br /> PROJECT: Reconstruct Existing Taxiway "F", <br /> San Marcos Municipal Airport <br /> San Marcos. Texas <br /> PREPARED BY: Michael Lynn Moore, P.E. <br /> Item <br /> No. Description Quantity Unit Cost Amount <br /> 1 2" HMAC Surface Course 565 TON $34.00 $19,210 <br /> 2 Cold Mix Recycle Base Material 5,394 S.Y. 1.75 9,440 <br /> 3 Crushed Aggregate Make Up Base 2,248 C.Y. 20.00 44,960 <br /> Course <br /> 4 Prime Coat 1,888 GAL 1.25 2,360 <br /> 5 Taxiway Markings 605 S.F. 0.55 333 <br /> 6 Remove & Replace Retroflective 22 EACH 15.00 330 <br /> Markers <br /> SUBTOTAL $76,633 <br /> Contingencies 7,663 <br /> TOTAL CONSTRUCTION COST $84,296 <br /> Engineering 5,204 <br /> Design Testing 1,800 <br /> Surveying 2,000 <br /> Construction Testing 1,300 <br /> Construction Inspection 3,800 <br /> TOTAL ESTIMATE $98,400 <br />