Laserfiche WebLink
<br />plans and specifications setting forth in detail the requirements for <br />construction, subject to review and approval by the Owner. Three (3) <br />sets of such documents shall be submitted to Owner. <br />1.4.2 The Engineer shall advise the Owner of any adjustments to <br />previous detailed cost estimates indicated by changes in requirements <br />or general market conditions by preparation of a revised, detailed cost <br />estimate. <br />1.4.3 The Engineer shall assist the Owner in filing documents <br />required for the approval of governmental authorities having <br />jurisdiction over the Project(s). <br />1.5 COHSTRUC'rIOH PHASE <br />1.5.1 It is understood by the parties hereto that the work will be <br />constructed by Owner's construction crew(s) and that the consultation <br />services of Engineer may be necessary during the construction phase of <br />the project. Owner and Engineer agree that said consulting services <br />are additional services. All such services shall be provided if <br />authorized or confirmed in writing by the Owner as provided in this <br />Agreement. Compensation for same shall be in accordance with Section <br />13.2.1 of this agreement. <br />1.5.2 The Engineer shall advise and consult with the Owner and <br />provide advice, if any, to Owner in writing. <br />1.5.3 The Engineer shall not have control or charge of and shall <br />not be responsible for construction means, methods, techniques, <br />sequences or procedures, or for safety precautions and programs in <br />connection with the Work, for the acts or omissions of Owner or for <br />the failure of Owner to carry out the Work in accordance with the plans <br />and specifications unless such acts or omissions are due to negligence <br />of the Engineer or are acts or omissions under the Engineer's control. <br />However, upon the request of the Owner, as provided herein, Engineer <br />shall advise Owner during the construction phase of the means, methods, <br />techniques, sequences and procedures of construction which will result <br />in a project(s) completed in accordance with the plans and <br />specifications. Whenever, in the Engineer's reasonable opinion, it is <br />necessary or advisable for the proper implementation of the intent of <br />the plans and specifications the Engineer shall advise Owner of the <br /> -3- <br />