My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1989-055
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1989
>
Res 1989-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2007 4:02:13 PM
Creation date
8/2/2007 4:02:13 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1989-55
Date
6/26/1989
Volume Book
95
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />specifications shall be interpreted to mean the plans and <br />specifications as reviewed and finally approved by the Owner. <br /> ARTICLE 2 <br /> ~ OWRER"S RESPONSIBILITIES <br />2.1 The Owner shall provide full information regarding <br />requirements for the project(s). Such information may include a <br />program, which shall set forth the Owner's design objectives, <br />constraints and criteria, including space requirements and <br />relationships, flexibility and expandability, special equipment and <br />systems and site requirements. <br />2.2 The Owner shall designate a representative authorized to act <br />in the Owner's behalf with respect to the project(s). The Owner and/or <br />such authorized representative shall examine the plans and <br />specifications submitted by the Engineer and shall render responses <br />pertaining thereto promptly and provide Engineer with requested data <br />or information in Owner's possession relating to the project(s). <br />2.3 The Owner shall provide access to and make all necessary <br />provisions for the Engineer to enter upon public and private property <br />as required for the Engineer to perform its services under this <br />Agreement. <br />2.4 The Owner shall furnish structural, mechanical, chemical and <br />other laboratory tests, inspections and reports as required by law or <br />or as reasonably needed by the Engineer. The Engineer shall not be <br />held responsible for its reliance on any such information supplied by <br />Owner provided that Engineer does not know or reasonably cannot be <br />expected to know of any deficiency or error in such information <br />supplied by Owner. <br />2.5 The Owner shall furnish required information and services and <br />shall render responses and conduct its review of written materials as <br />expeditiously as possible. <br />2.6 The Owner shall either direct the Engineer to perform any and <br />all Additional Services necessary to complete the project (s) or shall <br />furnish such services itself. <br />2.7 The Owner shall pay all fees for filing and processing <br />permits in connection with the project(s). <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.