My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-136/Approving an agreement with Halff Associates for the Sessom Drive phase II Improvement Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-136/Approving an agreement with Halff Associates for the Sessom Drive phase II Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2014 10:12:56 AM
Creation date
10/14/2013 11:12:49 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-136
Date
9/17/2013
Volume Book
200
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Preliminary and Design Phases of the Project will be developed under the following TASK <br />DESCRIPTION: <br />Task 1: Project Management. <br />1.1 Project Meetings. Engineer will attend monthly project meetings (maximum of six) with <br />City to review and discuss project progress and issues. In addition, a review meeting will be <br />held with City following the submittal of the each phase. Typically, three members of <br />Engineer's team will attend these meetings. Meeting minutes will be prepared and submitted <br />to City within forty eight (48) hours after each meeting. <br />1.2 Progress Reports. Prepare and submit monthly progress reports to the City with each <br />invoice. The progress reports will include: <br />• Summary of progress of work tasks, key decisions that require input from or discussion <br />with City staff, and a list of problems or unresolved issues. All issues shall be recorded <br />on a project "issues list" identifying the issue, the date it was a known issue, person <br />responsible for the solution, and the date the solution is required. <br />1.3 Coordination with TxDOT and CAMPO. Prepare and submit required update reports to <br />TxDOT and CAMPO. <br />1.3 Records Management: The Engineer shall maintain a project file at their office that is <br />available to City for review on a shared ftp site within twenty four (24) hours upon request. <br />1.4 Contract Administration: Engineer will administer the Professional Engineering Services <br />Agreement in accordance with the prescribed contract terms. Invoices will be prepared and <br />submitted to City on a monthly basis. Engineer will develop the schedule and will keep the <br />schedule current, with revisions made only with the expressed approval of City. <br />Task 2: Preliminary Design Phase Services <br />2.1 Data Collection: <br />2.1.1 Conduct an initial meeting with city staff and key design team members to review <br />work plan, establish key dates, discuss public input, and review design parameters. <br />2.1.2 Identify all utilities (COSM owned and private) and meet with the utility <br />companies to collect existing and proposed/planned utility location plans. For <br />records received, existing utilities will be drawn onto the topographic survey as <br />Quality Level D SUE information. <br />2.1.3 Obtain most recent mapping, floodplain delineation and GIS files from the City of <br />San Marcos, and include this information on the plans. <br />2.1.4 Perform preliminary reconnaissance. Field -walk the corridor with city staff to <br />determine issues, constraints, potential alignments, etc. Document findings and <br />record on available mapping. <br />2.1.5 Obtain, if available, and review additional existing plans, maps, studies, reports, <br />and records within the project area as identified during the preliminary <br />reconnaissance. Collect all pertinent information concerning proposed public or <br />private projects and/or improvements in the project area. <br />2.1.6 Conduct field survey. Obtain a detailed topographical and tree survey within the <br />existing right -of -way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.