Laserfiche WebLink
<br />notification of acceptance of proposal as follows and will endeavor to complete <br />the project no more than thirty (30) calendar days after commencing (Note: Days <br />listed below are man and field crew days and do not necessarily represent a 27 <br />day timetable). <br /> <br />Day 1 thru 5 - Review provided data and gather any additional data. (I, <br />1,2) <br /> <br />Day 6 thru 8 - Prepare deed plot. (I, 3) <br /> <br />Day 9 - Review deed plot and coordinate field work with <br />Director. (I, 4) <br /> <br />Day 10 thru 14 - Field survey of right-of-way and adjoiners. (I, 5) <br /> <br />Project <br /> <br />Day 15 thru 18 - Analyze field data and prepare sketch. (I, 6) <br /> <br />D~y 19 - Review field data sketch with Project Director. (1,7) <br /> <br />Day 20 thru 25 - Prepare Descriptions and Plats. (I. 8) <br /> <br />Day 26 - Set monuments at intersections. (I, 9) <br /> <br />Day 27 - Deliver Descriptions, <br />Copies, and Invoice. <br /> <br />Plats, <br /> <br />Coordinate Lists, <br /> <br />Field Book <br /> <br />III. <br /> <br />Surveying Firm and References . <br /> <br />Michael Moore, d.b.a. JHH Land Surveying, is a sole proprietor surveying company <br />that has been in business in San Marcos since March of 1987. The majority of <br />work done since opening has been boundary determination surveys, with a few <br />subdivisions, easements, and topographic surveys thrown in for good measure. <br /> <br />During October of 1986 through January of 1987, Michael Moore was responsible <br />for the descriptions and survey plats of over two-hundred (200) parcels of land <br />involved in an acquisition of additional right-of-way by the State of Texas for <br />U.S. Highway #59 (Northeast Freeway) in Houston, Texas. This project was done <br />under strict guidelines as to form and content set forth by the Department of <br />Highways of the State of Texas and all plats were prepared with an Intergraph PC <br />(Bently Software) CAD. <br /> <br />The U.S. Highway ~59 project was done while Michael Moore was employed by Espey, <br />Huston. and Associates, Inc., of Austin on loan to the EH&A Office in Houston. <br />The Project Manager was Juan F. Evertsz, RPS, of EH&A, 888 West Belt Drive <br />South, Suite 200, Houston, Texas 77042, (713) 781-8800. <br /> <br />IV. Biographical <br /> <br />Michael Hoore is a Registered Public Surveyor in the State of Texas with <br />experience surveying in twenty-one counties in this state, as well as having <br />been involved in surveys is Louisiana, Mississippi, and the Gulf of Mexico. <br /> <br />His surveying involvement in Central Texas include four (4) years with Pro-Tech <br />Engineering Group, Inc., of San Marcos, four (4) years with H.S. Bettersworth <br />