Laserfiche WebLink
<br />2.8 <br /> <br />The Owner shall pay all costs incident to obtaining bids or <br /> <br />proposals from contractors except costs incident to the preparation of <br /> <br />the final construction documents under 1.2.6 or 1.2.9 above. <br /> <br />Further, <br /> <br />Owner shall assume responsibility for the distribution of construction <br />contract documents to potential bidders. <br /> <br />2.9 <br /> <br />The Owner shall either direct the Engineer to perform any and <br /> <br />all Additional Services necessary to complete the project(s) or shall <br />furnish such services itself. <br /> <br />2.10 <br /> <br />The Owner <br /> <br />shall <br /> <br />pay <br /> <br />all <br /> <br />fees <br /> <br />for <br /> <br />filing and processing <br /> <br />permits in connection with the project(s). <br /> <br />2.11 <br /> <br />The Owner shall bear all costs incident to this Article. <br /> <br />2.12 <br /> <br />Owner <br /> <br />shall <br /> <br />provide <br /> <br />its <br /> <br />form <br /> <br />of <br /> <br />standard <br /> <br />construction <br /> <br />contract <br /> <br />documents <br /> <br />which <br /> <br />do <br /> <br />not <br /> <br />include <br /> <br />plans <br /> <br />or <br /> <br />technical <br /> <br />specifications, to the Engineer prior to commencement of the design <br />phase, Section 1.2. <br /> <br />2.13 <br /> <br />Owner shall provide the Engineer with the accounting basis <br /> <br />for billing acceptable to the Owner. <br /> <br />2.14 <br /> <br />Basic <br /> <br />horizontal <br /> <br />and <br /> <br />vertical <br /> <br />control <br /> <br />points <br /> <br />shall <br /> <br />be <br /> <br />established by the Owner. <br /> <br />All other construction necessary surveying <br /> <br />shall be the responsibility of the Owner. <br /> <br />ARTICLE 3 <br /> <br />CONSTRUCTION COST <br /> <br />3.1 <br /> <br />RESPONSIBILITY FOR CONSTRUCTION COST <br /> <br />3.1.1 <br /> <br />Evaluations of the Owner's Project budget and detailed cost <br /> <br />estimates, if any, prepared by the Engineer, represent the Engineer's <br /> <br />-14- <br />